Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Finance | -17.27% | ₹6.6 L | L1 | Admitted-Finance |
| 2 | L2₹6.7 L+₹5,598.09 (0.85%)Admitted-Finance | -16.57% | ₹6.7 L+₹5,598.09 (0.85%) | L2 | Admitted-Finance |
| 3 | L3₹7.0 L+₹34,068.39 (5.15%)Admitted-Finance | -13.01% | ₹7.0 L+₹34,068.39 (5.15%) | L3 | Admitted-Finance |
| 4 | L4₹7.4 L+₹76,693.86 (11.6%)Admitted-Finance | -7.68% | ₹7.4 L+₹76,693.86 (11.6%) | L4 | Admitted-Finance |
| 5 | L5₹7.7 L+₹1.1 L (16.0%)Admitted-Finance | -4.00% | ₹7.7 L+₹1.1 L (16.0%) | L5 | Admitted-Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
28 Jul 2026, 6:00 pmClosed
Executive Engineer Flood Control Division Kathua
Executive Engineer Flood Control Division Kathua
Civil Works
2026_IFC_317130_1
eNit 17 of 07/2026-27
Open Tender
Civil Works
Percentage
45 days
Kathua
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Flood Control Division Kathua
₹16,000
1 Aug 2026
21 Jul 2026
29 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge
All kinds of soil | - | Cum | 592.9 | - |
| 2 | Hand Packing stones in wire crates excluding cost of crates & stones | 1 | Cum | 371.15 | ₹370.78 |
| 3 | Supply of stones round above 15cm | 1 | Cum | 700 | ₹699.3 |
| 4 | Carriage of stones AV.11 km by MT and 50m by H.L | 1 | Cum | 579.79 | ₹579.21 |
| 5 | Supply & providing knitted crates (B.A.wire 4MM) of size 6 x 1.20 x 1.20 mesh 6" x 6" (42 No. crates) | - | Kg | 77 | - |
| 6 | Installation of Sign Board size 3x3 including writing and fixing at site (Lum Sump) | - | No | 12,000 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.73 MB
BOQ_1037896.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .