Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | -51.60% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹16,695 (5.97%)Admitted-Finance | -48.71% | ₹3.0 L+₹16,695 (5.97%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹22,125 (7.91%)Admitted-Finance | -47.77% | ₹3.0 L+₹22,125 (7.91%) | L3 | Admitted-Finance |
| 4 | L4₹3.1 L+₹31,715 (11.3%)Admitted-Finance | -46.11% | ₹3.1 L+₹31,715 (11.3%) | L4 | Admitted-Finance |
| 5 | L5₹3.3 L+₹49,739 (17.8%)Admitted-Finance | -42.99% | ₹3.3 L+₹49,739 (17.8%) | L5 | Admitted-Finance |
Tender Value
₹5.8 L
EMD Value
₹11,560
Closing Date
17 Aug 2026, 4:00 pmClosed
ER Mohd Iqbal Ganie
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_317410_7
NIT 32 Of 2026-27 Dated 23-07-2026
Open Tender
Civil Works
Percentage
Executive Engineer PWD RnB Division Banihal
Refer to NIT
3 documents required · 3 mandatory
₹300
Executive Engineer PWD RnB Division Banihal
₹11,560
Executive Engineer PWD RnB Division Banihal
27 Aug 2026
23 Jul 2026
18 Aug 2026
23 Jul 2026
17 Aug 2026
23 Jul 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 50 meter beyond 1 m from cutting edge All kinds of Soil | 42.09 | Cum | 673.3 | ₹28,339.2 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.41 | cum | 4,826.5 | ₹11,631.87 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | Cum | 5,733.6 | ₹5,727.87 |
| 0.0 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and
curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah | 57.2 | Cum | 5,402.9 | ₹3,09,045.88 |
| 0.0 | Filling stones in trenches including cost of stone Complete | 23.4 | Cum | 937.9 | ₹21,946.86 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 7.8 | sqm | 286.35 | ₹2,233.53 |
| 0.0 | Carriage of Material by Mechnical transport including loading, unloading and stacking at site all complete:
i) Sand for an avg lead of 30 Km by MT and 100 by H/L | 31.66 | Cum | 764.7 | ₹24,210.4 |
| 0.9 | ii) Stone aggregate below 40 mm for an avg lead of 30 Km by MT and 100 m by H/L | 22.04 | Cum | 764.7 | ₹16,853.99 |
| 0.0 | iii) Stone for an avg lead of 10 Km by MT and 100 m by H/L | 57.2 | Cum | 615.79 | ₹35,223.19 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_1040138.xls
BOQ • 0.32 MB
Extensionaugust.pdf
PDF • 0.51 MB
Corrigendumitr.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .