Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | L1 | Accepted-AOC BEING L1 BIDDER | |
| 2 | L2₹3.5 L+₹20,346.36 (6.16%)Rejected-Finance | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹3.7 L+₹37,228.66 (11.3%)Rejected-Finance OHLI KUNTWARA KUTAL KISHTWAR J K 182204 | KISHTWAR | KISHTWAR | JAMMU AND KASHMIR | 182204 | L3 | Rejected-Finance Being L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Techno Commercially non responsive | |
| 5 | Rejected-Technical | - | Rejected-Technical Techno Commercially non responsive |
Tender Value
₹4.0 L
EMD Value
₹8,000
Closing Date
10 Mar 2026, 6:00 pmClosed
DGM (C) Pnc Division Ratle HEP
PnC Div RHPCL Shalimar Colony kishtwar
Construction of Public Toilet at Upper Kandani, Drabshalla under CSR/Public outreach activities 2025-2026(Reserved for PAF/ local)
2026_RHPCL_267611_1
RH/RATLE/PnC/C-077/2026
Open Tender
Civil Works
Percentage
45 days
Near Rhpcl office shalimar Colony kishtwar
Please refer Tender documents.
9 documents required · 9 mandatory
₹590
Ratle Hydroelectric Power Corporation Limited
₹8,000
18 Sept 2026
17 Feb 2026
14 Mar 2026
17 Feb 2026
10 Mar 2026
17 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :Rate for a lead upto 25 meter beyond 1 m from cutting edge | 15.05 | Cum | 612.94 | ₹9,224.75 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.24 | Cum | 6,096.54 | ₹19,752.79 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand).Quarry | 5.35 | Cum | 8,163.33 | ₹43,673.82 |
| 4 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 7.18 | Sqm | 442.86 | ₹3,179.73 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6fine sand) | 13.06 | Sqm | 8,050.83 | ₹1,05,143.84 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.96 | Sqm | 8,281.41 | ₹16,231.56 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 13.87 | Cum | 763.66 | ₹10,591.96 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 134.83 | Cum | 131 | ₹17,662.73 |
| 9 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately) . Second class kail wood | 0.23 | Cum | 1,07,480.33 | ₹24,720.48 |
| 10 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note: -Butt hinges and necessary screws shall be paid separately). Second class kail wood. 30 mm | 2.85 | Cum | 2,762.19 | ₹7,872.24 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
TD77.pdf
Tender Documents • 3.25 MB
BOQ_311212.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .