Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance D NO 106C 14TH STREET KEASAVAPURAM NAALUR POST MINJUR 601203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹10,514
Closing Date
4 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE CDC TANGEDCO
A10 Thiru .vi.ka Industrial Estate guindy
Construction of one number of Transformer Plinth with cable duct at 33/11 KV Indoor Substation at Vedachalam Nagar
2021_EB_191890_1
OTNO21/2020-21
Open Tender
Civil Works
Works
20 days
A10 Thiru .vi.ka Industrial Estate guindy
As per tender document
2 documents required · 2 mandatory
₹0
₹10,514
Yes
5 Feb 2021
21 Jan 2021
5 Feb 2021
21 Jan 2021
4 Feb 2021
21 Jan 2021
21 Jan 2021 - 4 Feb 2021
180 days
Amount
Providing reinforced cement concrete vertical cast in situ bored pile 500 mm dia of effective length of 5.0m for control room using M 30 design mix concrete and 12mm to 20mm HBGS jelly metal ISS excluding cost of steel reinforcement, including providing of temporary casing pipe of minimum length of 1m at top using for stablishing the sides of bore holes for the remaining length concreting for this pile shall be done through transit pipes and minimum cement content shall be not less than 400 kg/m3. The reinforcement of the pile must be done upto top level of the pile cap, excluding cost of pile reinforcement. The cost includes mobilisation and de mobilisation of pile equipment, all materials, lead, lift, labour,ect., complete.
Empty boring in earth from GL to cut off level (bottom of pile cap) including cost of all materials,lead,lift,etc.,complete.The depth of boring may vary due to site condition as directed by Engineer-in-charge.
Earthwork excavation in all soils and subsoils, hard stiff clay, black cotton soils, murram, hard red earth, gravel, stone earth etc., complete with an initial lead of 10m and lift of 2 including labour and tools etc., complete for foundation.
Supplying and Filling with filling sand for foundation and basement including cost of filling sand, labour for filling, watering, and well ramming with all lead, lift etc., complete.
Refilling with excavated earth including cost of labour and tools , lead, lift, etc., complete
Transporting the balance excavated earth by headload upto 100m including loading and unloading and transporting and filling in low level places of SS complex as directed by Engineer including all leads, lifts, labour, tools etc., complete
Laying plain cement concrete 1:4:8 Design mix using 220kg min.cement content for foundation and basement including cost of all materials, lead, lift and labour for laying concrete etc.
Laying plain cement concrete M15 Design mix using 240kg minimum cement content and using 20mm HBG (machine broken) for TRANSFORMER PLINTH including cost of all materials, lead, lift and labour complete as per std.specification.
Laying reinforced cement concrete M25 using 12mm to 20mm HBG metal and 360kg of minimum cement content for various types of work including necessary shuttering, formwork, lead, lift, labour etc.,complete but excluding cost of reinforcement.
FOUNDATION AND BASEMENT
Beams
Base Concrete / Raft
Column
Cast - in - Situ Concrete slab
R.C.C. Side Wall
Supply, fabrication and placing reinforcement for all R.C.C. works including cost of steel and all lead, lift, labour for cutting, bending and placing reinforcement as per plan and tying with binding wire and including cost of binding wire, labour and work at all levels etc., complete.
Plastering with cement mortar as indicated below including cost of all materials and all leads, lifts, labours, for plastering at all floors including labour, scaffolding, curing, etc, as per standard specification.
Plastering with CM 1:4,12mm thick
White washing with cement paint, two coats over a coat of primer for transformer plinth and other surface at all levels all materials, leads, lifts, labour for scaffolding brush etc. complete.
Outside Wall paint two coats with best quality plastic emulsion of approved colour over a primer coat and putty over cement plastered surface including cost of all materials, leads, lifts, labour, scaffolding etc., complete.
Supplying,fabricating and fixing in position of MS rails 90LBS at various levels as per approved design of the Engr.including cost of steel and other required materials, labour charges, transportation and fixing, taking grooves in BM/RCC, packing the pockets with CC and painting with one coat metal primer complete.
Supplying and fixing of heavy duty C. I. Manhole cover with pedastal square 600x600mm (HD) or RCC cover slab with pedastal square for the sewer manholes including cost of all materials, labour charges, etc., complete as per std. specification and as directed by the Engineer.
GST for bidders within TamilNadu
JD ENTERPRISES
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .