Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.3 LAccepted-AOC 414 PURBI COMPLEX A T ROAD DIST KAMRUP M GUWAHATI ASSAM | KAMRUP | ASSAM | 781030 | L1 | Accepted-AOC L1 | |
| 2 | L2₹80.2 L+₹1.9 L (2.49%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical WARD NO 3 SUBHASHPALLY P O P S KOKRAJHAR DIST KOKRAJHAR BTC ASSAM PIN 783370 | KOKRAJHAR | KOKRAJHAR | ASSAM | 783370 | - | Not Admitted-Fee/PreQual/Technical Others-Hardcopy Not Received | |
| 4 | Not Admitted-Fee/PreQual/Technical ASSAM AS | - | Not Admitted-Fee/PreQual/Technical Others-Hardcopy Not Received |
| Sl No | Description | Qty | Unit | kamalchgoyary L2 | ACHINTA NARZARY L1 |
|---|---|---|---|---|---|
| 1.00 | 1. DISMANTLING WORK :
Dismantling roofing induding ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:
15.28.1 G.S. Sheet | 363.64 | Sqm | 140 ₹50,909.6 | 135 ₹49,091.4 Lowest |
| 2.00 | Dismantling steel work in built up sections in angles, tees, flats and channels induding all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
11.1.1 1:4 (1 cement : 4 coarse sand) | 6,993 | Kg | 5 ₹34,965 | 4 ₹27,972 Lowest |
| 3.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :
15.12.2 Oof area beyond 3 sq. metres | 18 | Each | 494.15 ₹8,894.7 | 414.55 ₹7,461.9 Lowest |
| 4.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable materlal and disposal of unserviceable materlal within 50 metres lead as per direction of Engineer-in-charge.
15.7.4 In cement mortar | 46.23 | Cum | 1,698.45 ₹78,519.34 Lowest | 1,698.45 ₹78,519.34 Lowest |
| 5.00 | Demolishing R.C.C. work manualy/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- charge. | 63.92 | Cum | 2,928.1 ₹1,87,164.15 | 2,920 ₹1,86,646.4 Lowest |
| 6.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 20.98 | Cum | 6,882 ₹1,44,384.36 | 6,850 ₹1,43,713 Lowest |
| 7.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, |transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 131.13 | Sqm | 219.35 ₹28,763.37 Lowest | 219.35 ₹28,763.37 Lowest |
| 8.00 | 2. CONSTRUCTION OF APPROACH ROAD (LENGTH = 235.43 M) :
Preparation of sub-base road pavement with commercial dry lime (slaked), fly ash stabilised soil with a mix of 3% lime, 12% fly ash and 85% local suitable soil by weight, so as to achieve minimum field C.B.R. of 20, including mixing, rolling with road roller curing etc. all complete.
16.51.1 Minimum thickness 15 cm | 130.66 | Cum | 1,321.95 ₹1,72,731.27 Lowest | 1,321.95 ₹1,72,731.27 Lowest |
| 9.00 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
16.78.2 With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 | 130.66 | Cum | 2,775.65 ₹3,62,677.53 Lowest | 2,775.65 ₹3,62,677.53 Lowest |
| 10.00 | Cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete. | 87.11 | Cum | 7,500 ₹6,53,317.5 | 7,399.2 ₹6,44,536.91 Lowest |
Tender Value
₹78.4 L
EMD Value
₹1.6 L
Closing Date
30 Jun 2025, 1:30 pmClosed
the Addl. Chief Engineer, PWD, BTC
O/o the Addl. Chief Engineer, PWD, BTC
Dismantling cost of existing Assam type building, area devlopment of College campus, e.g. earth filling, construction of road, car bike parking at U.N. Brahma College in Chirang District, BTC, Assam.
2025_BTC_44796_1
No. ACE-106/PWD/IFB/PT-I/2023-24
Open Tender
Civil Works - Building
Item Rate
180 days
Chirang
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,600
₹1.6 L
Yes
16 Aug 2025
9 Jun 2025
1 Jul 2025
9 Jun 2025
30 Jun 2025
9 Jun 2025
9 Jun 2025 - 30 Jun 2025
Amount
1. DISMANTLING WORK : Dismantling roofing induding ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: 15.28.1 G.S. Sheet
Dismantling steel work in built up sections in angles, tees, flats and channels induding all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. 11.1.1 1:4 (1 cement : 4 coarse sand)
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : 15.12.2 Oof area beyond 3 sq. metres
Demolishing brick work manually/ by mechanical means including stacking of serviceable materlal and disposal of unserviceable materlal within 50 metres lead as per direction of Engineer-in-charge. 15.7.4 In cement mortar
Demolishing R.C.C. work manualy/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- charge.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, |transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
2. CONSTRUCTION OF APPROACH ROAD (LENGTH = 235.43 M) : Preparation of sub-base road pavement with commercial dry lime (slaked), fly ash stabilised soil with a mix of 3% lime, 12% fly ash and 85% local suitable soil by weight, so as to achieve minimum field C.B.R. of 20, including mixing, rolling with road roller curing etc. all complete. 16.51.1 Minimum thickness 15 cm
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. 16.78.2 With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25
Cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 coarse sand)
3. CONSTRUCTION OF DRAIN (LENGTH = 281.60 M): Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil
Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks: 11.1.1 1:4 (1 cement : 4 coarse sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 coarse sand)
4. CONSTRUCTION OF PARKING AREA : Preparation of sub-base road pavement with commercial dry lime (slaked), fly ash stabilised soil with a mix of 3% lime, 12% fly ash and 85% local suitable soil by weight, so as to achieve minimum field C.B.R. of 20, including mixing, rolling with road roller curing etc. all complete. 16.51.1 Minimum thickness 15 cm
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. 16.78.2 With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 16.91.1 60 mm thick C.C. paver block of M-35 grade with approved color design and pattern.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 coarse sand)
5. CONSTRUCTION FOR GARDEN AREA = 4 (FOUR) NOS. : Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 coarse sand)
Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ramming and watering, all complete as per drawing and direction of Engineer -in - charge.
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. 9.48.1 Fixed to steel windows by welding
6. CONSTRUCTION OF PARKING SHED = 2 (TWO) NOS : Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil
Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks: 11.1.1 1:4 (1 cement : 4 coarse sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: 6.2.1 Cement mortar 1:4 (1 cement : 4 coarse sand)
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 12.5mm nominal size)
Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) : 6.3.2 With Modular bricks
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 10.16.1 Hot finished welded type tubes
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 12.1.3 0.63 mm thick with zinc coating not less than 275 gm/m²
62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacture’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 coarse sand)
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Finishing walls with Acrylic Smooth exterior paint of required shade : 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
7. CONSTRUCTION OF ENTRANCE ROAD (LENGTH = 91.70 M) : Preparation of sub-base road pavement with commercial dry lime (slaked), fly ash stabilised soil with a mix of 3% lime, 12% fly ash and 85% local suitable soil by weight, so as to achieve minimum field C.B.R. of 20, including mixing, rolling with road roller curing etc. all complete. 16.51.1 Minimum thickness 15 cm
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. 16.78.2 With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25
Cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 coarse sand)
kamalchgoyary (BID ID -270227)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .