Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-Finance | ₹11.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹14.3 L+₹2.9 L (25.0%)Rejected-Finance | ₹14.3 L+₹2.9 L (25.0%) | L2 | Rejected-Finance L2 |
| 3 | L2₹14.3 L+₹2.9 L (25.0%)Rejected-Finance | ₹14.3 L+₹2.9 L (25.0%) | L2 | Rejected-Finance L2 |
| 4 | L2₹14.3 L+₹2.9 L (25.0%)Rejected-Finance AT KAGURIGORADA PO HANTUK PURI | ₹14.3 L+₹2.9 L (25.0%) | L2 | Rejected-Finance L2 |
| 5 | L2₹14.3 L+₹2.9 L (25.0%)Rejected-Finance | ₹14.3 L+₹2.9 L (25.0%) | L2 | Rejected-Finance L2 |
Tender Value
₹14.3 L
EMD Value
₹14,300
Closing Date
5 Jun 2026, 1:00 pmClosed
Superintending Engineer
O/o the SE, Kendrapara Irr. Division, Kendrapara
Canal improvement
2026_KIRRD_129770_49
e-Procurement Notice No.KID-02 of 2026-27
Open Tender
Civil Works - Canal
Percentage
120 days
Kendrapara
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹14,300
Yes
25 Jul 2026
26 May 2026
6 Jun 2026
26 May 2026
5 Jun 2026
26 May 2026
26 May 2026 - 1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation and plinth including dressing & leveling the bed and depositing the excavated materials away from the work site with all leads, lifts & delifts etc. complete as per direction of the Engineer-in-charge. | 288 | One Cum. | 210.5 | ₹60,624 |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. | 72 | One Cum. | 992.7 | ₹71,474.4 |
| 3 | CC (M-15) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. | 180 | One Cum. | 6,345.1 | ₹11,42,118 |
| 4 | Rigid smooth centering & shuttering for CC/RCC works including false work and dismantling them after casting including cost, carriage and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. | 510.6 | One Sqm | 252.1 | ₹1,28,722.26 |
| 5 | Filling foundation & plinth with the excavated materials including watering & ramming with all leads, lifts and delifts etc. complete as per direction of the Engineer-in-charge. | 204 | One Cum. | 118.1 | ₹24,092.4 |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
TechBidKID_102.pdf
Tender Documents • 1.12 MB
BOQ_592666.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .