Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.0 L+₹14,940.01 (2.20%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹7.0 L+₹17,131.21 (2.52%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹7.0 L+₹18,127.21 (2.67%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹7.1 L+₹32,071.22 (4.72%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹10.0 L
EMD Value
₹19,920
Closing Date
29 Jul 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_316216_6
e-NIT 13 of REW Poonch 2026-27 Date 15-07-2026
Open Tender
Civil Works
Percentage
40 days
POONCH
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Division Poonch
₹19,920
17 Aug 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | - | SQM | 91.75 | - |
| 2 | Supply and stocking of hard stone for stone pitching at site with complete job | 74.79 | cum | 1,235.5 | ₹92,403.05 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 7,788.4 | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | - | Kg | 115.2 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 150.2 | sqm | 286.35 | ₹43,009.77 |
| 6 | Carriage of sand/Agg. by 20 KM by MT | - | cum | 409.94 | - |
| 7 | Add Cost of CIB | 1 | No | 1,000 | ₹1,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_1029988.xls
BOQ • 0.32 MB
Extentionofdate11to13NIT.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .