Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹637.1 CrAccepted-AOC S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | ₹637.1 Cr Quoted ₹660 | L1 | Accepted-AOC FOUND AS L1 AND APPROVED BY GOVT.IN DOWR. |
| 2 | L2₹714Rejected-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹714 | L2 | Rejected-Finance Found as L2 in the bidding process with total cost Rs.714,19,34,785.00 ( cost of execution Rs.697,15,00,000.00 and cost of O and M Rs.5,00,00,000.00) |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFIED IN THE MINIMUM ELIGIBILITY AND QUALIFYING CRITERIA OF SECTION-II,INSTRUCTION TO BIDDERS. |
| 4 | Rejected-Technical 114B E SYKES EXTENSION KOLHAPUR MAHARASTRA | KOLHAPUR | MAHARASHTRA | 416001 | - | - | Rejected-Technical NOT QUALIFIED IN THE MINIMUM ELIGIBILITY AND QUALIFYING CRITERIA OF SECTION-II,INSTRUCTION TO BIDDERS. |
| 5 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFIED IN THE MINIMUM ELIGIBILITY AND QUALIFYING CRITERIA OF SECTION-II,INSTRUCTION TO BIDDERS. |
Tender Value
Refer Docs
Closing Date
12 May 2022, 5:00 pmClosed
CCE,LSP,Balangir
O/o the CCE,LSP,At-Laltikra,Dist-Balangir,Pin-767002
Execution of Pressurized UGPL Irrigation Network system for Left command of Lower Suktel Irrigation Project with Distribution network up to 1 Ha sub-chak compatible with micro irrigation having total planned CCA of 13000 Ha on EPC mode of contract.
2022_CEEBO_76062_1
04/2021-22 of CCE,LSP,Balangir
Open Tender
Civil Works - Water Works
913 days
Balangir
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
Exempted
Virtual mode
31 Dec 2022
14 Mar 2022
13 May 2022
14 Mar 2022
12 May 2022
14 Mar 2022
14 Mar 2022 - 27 Mar 2022
29 Mar 2022
Amount
Execution of Pressurized UGPL Irrigation Network system for Left command of Lower Suktel Irrigation Project with Distribution network up to 1 Ha sub-chak compatible with micro irrigation having total planned CCA of 13000 Ha on EPC mode of contract( Turn-Key Basis) including power system connectivity, Electro-Mechanical components, PIM and operation & maintenance of complete commissioned system for 5 years.
Operation & maintenance of UGPL irrigation system for 5(five) years or five Kharif water supply seasons whichever is more, after completion as per relevant clauses of the agreement.
LARSEN AND TOUBRO LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid