Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹15.1 L+₹1.3 L (9.14%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.8 L
EMD Value
₹39,600
Closing Date
17 Jul 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
ESTABLISHMENT OF COMMUNITY LIBRARY WITH BASIC FACILITIES AT SANGERWANI
2026_RDPR_315271_4
e- NIT No. 46/2026-27 Dated 09-07-2026
Open Tender
Civil Works
Percentage
30 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer REW Pulwama
₹39,600
21 Jul 2026
9 Jul 2026
18 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 42.43 | cum | - | - |
| 2 | Supplying and laying of stone soling / Plum hand packed tightly including ramming, watering including all leads & Lifts complete Job | 5.41 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:4:8 (1Cement: 4 fine sand: 8 graded stone
aggregate 40mm nominal Size) | 6.4 | cum | 1 | ₹6.39 |
| 4 | CAST-IN-SITU
Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level
5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.58 | cum | 1 | ₹7.57 |
| 5 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 25.11 | cum | - | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.91 | cum | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,182.64 | kg | - | - |
| 8 | Centering and shuttering including strutting propping etc. and removal of form work; Foundations, footings, bases of columns, mass concreting. | 79.06 | sqm | - | - |
| 9 | Centering and shuttering including strutting propping etc. and removal of form work; Suspended floors, roofs, landings, balconies and access platforms. | 84.13 | sqm | - | - |
| 10 | Brick work with FPS bricks of class designation 75 in super structure in cement mortar 1:6 (1 Cement : 6 Coarse sand) including Extra Brick Work in superstructure above plinth level upto Floor Five Level | 26.43 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_1022126.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .