| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹88.3 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹88.9 L+₹62,682.38 (0.71%)Rejected-Finance | L-2 | Rejected-Finance L-2 |
| Sl No | Description | Qty | Unit | MAA GAYATRI CONSTRUCTION L1 | RAKESH SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Jungle clearence cutting heavy under growth and bushes upto 7.50 cm dia. Including removal. | 6,048 | sqm | 2 ₹12,096 Lowest | 2.11 ₹12,761.28 |
| 2.00 | Dismentling of existing slab including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | 32.58 | cum | 62.8 ₹2,046.02 Lowest | 633.59 ₹20,642.36 |
| 3.00 | Dismentling of Masonary Brick work icluding all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | 75.15 | cum | 273.6 ₹20,561.04 Lowest | 396 ₹29,759.4 |
| 4.00 | Steel rainforcement including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | 7.45 | M.T | 60,000 ₹4,46,820 | 59,303.15 ₹4,41,630.56 Lowest |
| 5.00 | Centering & Shuttering for R.C.C. work including all cost material labour T&P etc. complete. | 318.41 | M2 | 458 ₹1,45,831.78 Lowest | 483.19 ₹1,53,852.53 |
| 6.00 | R.C.R. 1:4 including all cost material labour T&P etc. complete. | 66.43 | M3 | 4,524.04 ₹3,00,513.88 | 4,410.63 ₹2,92,980.51 Lowest |
| 7.00 | C.C. 1:3:6 Cement sand & mortar including all cost material labour T&P etc. complete. | 284.06 | M3 | 3,895.22 ₹11,06,476.19 | 3,869.28 ₹10,99,107.68 Lowest |
| 8.00 | C.C. 1:2:4 including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | 41.82 | M3 | 4,664.99 ₹1,95,089.88 Lowest | 4,730.84 ₹1,97,843.73 |
| 9.00 | C.C. 1:1.5:3 in Wearing coat on top of slab including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | 95.72 | M3 | 5,574.2 ₹5,33,534.55 Lowest | 5,727 ₹5,48,159.81 |
| 10.00 | Brick work class 150 with (1:4) cement sand mortar including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | 144.53 | M3 | 5,693.13 ₹8,22,828.08 | 4,995.94 ₹7,22,063.21 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
16 Jul 2026, 2:30 pmClosed
SE IWC BANDA
SE IWC BANDA
Renovation of Khanna Inspection House under the control of Irrigation Division Mahoba in District Mahoba. (LOT-02)
2026_UPIDC_1167867_1
06/SE/2026-27 dt 30-06-2026
Open Tender
Civil Works
Item Wise
180 days
MAHOBA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.1 L
SE IWC BANDA
31 Aug 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearence cutting heavy under growth and bushes upto 7.50 cm dia. Including removal. | - | sqm | 2.5 | - |
| 2 | Dismentling of existing slab including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | 1 | cum | 750.7 | ₹749.95 |
| 3 | Dismentling of Masonary Brick work icluding all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | - | cum | 469.2 | - |
| 4 | Steel rainforcement including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | - | M.T | 70,264.4 | - |
| 5 | Centering & Shuttering for R.C.C. work including all cost material labour T&P etc. complete. | - | M2 | 572.5 | - |
| 6 | R.C.R. 1:4 including all cost material labour T&P etc. complete. | 0.4 | M3 | 5,225.87 | ₹2,090.35 |
| 7 | C.C. 1:3:6 Cement sand & mortar including all cost material labour T&P etc. complete. | - | M3 | 4,584.46 | - |
| 8 | C.C. 1:2:4 including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | - | M3 | 5,605.26 | - |
| 9 | C.C. 1:1.5:3 in Wearing coat on top of slab including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | - | M3 | 6,785.54 | - |
| 10 | Brick work class 150 with (1:4) cement sand mortar including all cost material labour T&P etc. complete as per direction of Engineer-in-charge. | - | M3 | 5,919.36 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
TD.pdf
Tender Documents • 2.35 MB
BOQ_2190212.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .