| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-Finance | ₹1.2 Cr | 1 | Accepted-Finance Accept |
| 2 | 2₹1.2 CrRejected-Finance | ₹1.2 Cr | 2 | Rejected-Finance Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Monika Construction L2 | Nirajankumar L3 | rcihfield enterprises L4 | GS Construction L5 | ETHIRAJAN A S L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 184.8 | Cum | 220 ₹40,656 | 250 ₹46,200 | 262 ₹48,417.6 | 265 ₹48,972 | 260 ₹48,048 |
| 2.00 | Filling with M. sand with cost and conveyance including all other labour charges etc complete | 23.1 | Cum | 1,500 ₹34,650 | 1,700 ₹39,270 | 1,800 ₹41,580 | 1,805 ₹41,695.5 | 1,500 ₹34,650 |
| 3.00 | CC 1:4:8 mix using 40mm ISS HBG metal with cost and conveyance including all other labour charges etc complete | 23.1 | Cum | 4,800 ₹1,10,880 | 4,800 ₹1,10,880 | 5,340 ₹1,23,354 | 5,405 ₹1,24,855.5 | 4,000 ₹92,400 |
| 4.00 | Centering with shuttering for all cc works using MS sheet with cost and conveyance Incluidng all other labour charges etc complete | 369.6 | Sqm | 500 ₹1,84,800 | 450 ₹1,66,320 | 545 ₹2,01,432 | 550 ₹2,03,280 | 450 ₹1,66,320 |
| 5.00 | CC 1:2:4 mix using 20mm ISS HBG metal with cost and conveyance including all other labour charges etc complete | 55.44 | Cum | 5,700 ₹3,16,008 | 6,000 ₹3,32,640 | 6,600 ₹3,65,904 | 6,705 ₹3,71,725.2 | 5,500 ₹3,04,920 |
| 6.00 | Plastering in cm 1:5 mix of 12mm thick with cost and conveyance including all other labour charges etc complete | 92.4 | Sqm | 230 ₹21,252 | 250 ₹23,100 | 285 ₹26,334 | 280 ₹25,872 | 200 ₹18,480 |
| 7.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., | 92.4 | Sqm | 220 ₹20,328 | 200 ₹18,480 | 262 ₹24,208.8 | 265 ₹24,486 | 200 ₹18,480 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18% | 92.4 | GST Amount | 1,31,143.32 ₹1,21,17,642.77 | 1,32,640.2 ₹1,22,55,954.48 | 1,49,621.47 ₹1,38,25,023.83 | 1,51,359.52 ₹1,39,85,619.65 | 1,22,993.64 ₹1,13,64,612.34 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
25 Feb 2026, 3:00 pmClosed
BDO VP
KTR
Providing Cement Concrete Drain to Amman Koil Street in Appur Panchayat at Kattankolathur Panchayat Union
2026_RDTN_664748_1
2297/2025/B2 dt 18.02.2026
Open Tender
Civil Works
90 days
BDO KTR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹10,000
Yes
6 May 2026
23 Feb 2026
25 Feb 2026
23 Feb 2026
25 Feb 2026
23 Feb 2026
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Filling with M. sand with cost and conveyance including all other labour charges etc complete
CC 1:4:8 mix using 40mm ISS HBG metal with cost and conveyance including all other labour charges etc complete
Centering with shuttering for all cc works using MS sheet with cost and conveyance Incluidng all other labour charges etc complete
CC 1:2:4 mix using 20mm ISS HBG metal with cost and conveyance including all other labour charges etc complete
Plastering in cm 1:5 mix of 12mm thick with cost and conveyance including all other labour charges etc complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_798297.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_798297.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid