Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC Award |
| 2 | L2₹2.4 Cr+₹15,418.12 (0.06%)Rejected-Finance HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | ₹2.4 Cr+₹15,418.12 (0.06%) | L2 | Rejected-Finance you are L-2 |
| 3 | L3₹2.6 Cr+₹23.0 L (9.63%)Rejected-Finance | ₹2.6 Cr+₹23.0 L (9.63%) | L3 | Rejected-Finance you are L-3 |
Tender Value
₹2.8 Cr
EMD Value
₹5.5 L
Closing Date
27 Oct 2021, 5:00 pmClosed
EE PHED No. 1, Panipat
EE PHED No. 1, Panipat
Prov. Water supply and Sewerage system at village Khukrana Distt. Panipat
2021_HRY_190292_1
EIC memo No.69347-PHE/Mont dt. 27.08.2021-Khukrana
Open Tender
Civil Works
Works
548 days
Panipat
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹5.5 L
15 Dec 2021
29 Sept 2021
27 Oct 2021
29 Sept 2021
27 Oct 2021
29 Sept 2021
Amount
NS ITEMS
NS ITEMS WATER SUPPLY PART - A Supply, erection, testing and commissioning of flow meter (KRONE Make) with digital display of complete in all respct. 150MM i/d
Supply, erection, testing IS Marked copper wire for tubewell connection complete in all respect with accessories like thimble etc. 100mm2 3 core
NS ITEMS SEWERAGE SYSTEM (PART-B) Supply, fixing, jointing and commissioning of suitable size mannual operated CI sluice gate including all labour, jointing material and accessories which are required complete in all respect to the entire satisfaction of Engineer-in-Charge depth of pipe on which the gate is to be installed 4.40 mtr. below ground level. Suitable size for 350 mm i/d sewer.
O&M WATER SUPPLY PART - A + SEWERAGE SYSTEM PART - B (OPERATION & MAINTENANCE) Operation & maintenance for the complet scope of work mentioned in the DNIT (Disinfection Material will be supplied by the PHED) as per schedule-IV during Defect Liability period of 12 Months & 5 years thereafter (will be charged to A/mtc. estimate) (i) Defect Liability (Operation Only)
(ii) Operation & Maintenance during 1st year
(iii) Operation & Maintenance during 2nd year
(iv) Operation & Maintenance during 3rd year
(v) Operation & Maintenance during 4th year
(vi) Operation & Maintenance during 5th year
Bidder Name
Amount
Jaiveer Singh Contractor(GSTN-06ATQPS8420H1Z8)
Gaurav Goel Contractor(GSTN-06AIDPG3727D1ZR)
GANPATI ELEC. & MECH. WORKS(GSTN-NA)
Gaurav Goel Contractor
GANPATI ELEC. & MECH. WORKS
Jaiveer Singh Contractor
GANPATI ELEC. & MECH. WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .