Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 L+₹84,700 (18.3%)Admitted-Finance | ₹5.5 L+₹84,700 (18.3%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 L+₹1.3 L (28.9%)Admitted-Finance | ₹6.0 L+₹1.3 L (28.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SONI TUBEWELL WORKS L1 | radhey krishna borewells L2 | M/S Arihant Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.01 | Development of tube well in accordance with IS:2800 (part-I) ans IS:11189 to establish maximum rate of useable water yield without sand conent (beyond permissible limit),with required capacity air complressor,running the compressor for required time till well is fully developed,measuring yield of well by "V" notch method or any other approved method , collecting water samples & getting tested in approved laboratory,i./c disinfection of tube well,all complete,i./c hire & labour charges of air compressor, tools & accessories etc. all as per requirement and direction of Engineer -in -charge. | 675 | hrs. | 4,38,750 ₹4,38,750 Lowest | 5,13,000 ₹5,13,000 | 5,60,250 ₹5,60,250 |
| 2.02 | Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading &sizes as per actual requirement, all complete as per direction of Engineer-in-charge. | 25 | CUM | 25,000 ₹25,000 Lowest | 35,450 ₹35,450 | 37,500 ₹37,500 |
Tender Value
Refer Docs
EMD Value
₹15,300
Closing Date
25 Mar 2026, 3:00 pmClosed
EE(Civil)-09
H-Block, Sector-15, Rohini, Delhi-89
Repairing of tubewells by redevelopment at various locations in Squattered Resettlement Colonies and adjoining areas in AC-01 Narela under EE(C)-09
2026_DJB_288973_1
NIT No. 32/7
Open Tender
Civil Works
Item Rate
60 days
EE(Civil)-09
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB Account No. 50448339804
₹15,300
28 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Development of tube well in accordance with IS:2800 (part-I) ans IS:11189 to establish maximum rate of useable water yield without sand conent (beyond permissible limit),with required capacity air complressor,running the compressor for required time till well is fully developed,measuring yield of well by "V" notch method or any other approved method , collecting water samples & getting tested in approved laboratory,i./c disinfection of tube well,all complete,i./c hire & labour charges of air compressor, tools & accessories etc. all as per requirement and direction of Engineer -in -charge. | - | hrs. | - | - |
| 2.02 | Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading &sizes as per actual requirement, all complete as per direction of Engineer-in-charge. | - | CUM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.33 MB
NIT32.pdf
Tender Documents • 7.31 MB
BOQ_383529.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .