Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹133.7 Cr
EMD Value
₹15 L
Closing Date
13 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
HQ Chief Engineer Delhi Zone
HQ Chief Engineer Delhi Zone Delhi Cantt-10
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) OF PROVISION OF 126 DUS AND ALLIED WORK AT DELHI CANTT
2026_MES_792934_1
CEDZ/TOKEN-37 OF 2026
Open Tender
Civil Works
Lump-sum
2737 days
Delhi Cantt-10
As per NIT
15 documents required · 15 mandatory
₹3,000
GE P BR Base Hosp
₹15 L
Yes
HQ Chief Engineer Delhi Zone
8 Oct 2026
8 Oct 2026
18 Nov 2026
8 Oct 2026
13 Nov 2026
6 Nov 2026
8 Oct 2026 - 15 Oct 2026
16 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sch 'A' Part I | |||||
| 1.1 | Construction of New Building for MD Accn Block (For Lt Gen (S/S) (40 DUs) and Maj Gen (Multistorey) for Army (86 DUs)126 DUs (S+9) with 02 Qtrs per Floor, Roof top mumty for 05 Blocks and Ground Floor as Stilt,RCC Monolithic Shear Framed Construction using Prefabricated Aluminum Formwork as per Seismic Zone IV complete all as specified, as per approved drawings, as per Accn Statement Part-II(Exhibit-I), minimum M-30 design mix, as per DBR and specifications including all fittings and fixtures like doors, windows, tiling, false ceiling, painting, curtain rods, plumbing and sanitary fittings, Internal water supply,Plinth protection, PCC saucer drain around bldg, APP Roof Treatment, Foundation, Furniture etc. | 1 | LUMP SUM JOB | - | - |
| 2Sch 'A' Part II | |||||
| 2.1 | Comprehensive Maintenance of entire assets, buildings, roads, E/M services etc for a period of 03 years post DLP of Main Project and M&O of all installations for 05 years from date of completion of Main Project | 1 | LUMP SUM JOB | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
1. Content page.pdf
Tender Documents • 0.10 MB
4.0 Scope of work incl Annx I to XVIII.pdf
Tender Documents • 1.09 MB
4.1 Annexure_XX - Comprehensive Maint.pdf
Tender Documents • 0.19 MB
4.1 Exhibit-1 AS PART-2.pdf
Tender Documents • 0.10 MB
4.3 Exhibit 2 Sch of finishes.pdf
Tender Documents • 0.12 MB
4.4 Sch 'A' Notes.pdf
Tender Documents • 0.22 MB
4.5 Schedule B C D.pdf
Tender Documents • 0.05 MB
4.7 Letter of Intent and EPC Agreement.pdf
Tender Documents • 0.11 MB
4.8 Tender page.pdf
Tender Documents • 0.10 MB
5.4 GCC and Correction Slip.pdf
Tender Documents • 0.11 MB
6.1 DBR Structure.pdf
Tender Documents • 0.23 MB
6.2 DBR Architecture.pdf
Tender Documents • 0.12 MB
6.3 DBR- EM works.pdf
Tender Documents • 0.54 MB
6.4 DBR Planning.pdf
Tender Documents • 0.47 MB
7.1 Special Condition.pdf
Tender Documents • 0.37 MB
7.2_Payment Schedule.pdf
Tender Documents • 0.11 MB
8.1 Particular Specifications.pdf
Tender Documents • 0.96 MB
8.2 List of Materials Appx A & B.pdf
Tender Documents • 0.11 MB
8.3 Appendix C.pdf
Tender Documents • 0.16 MB
8.4 List of Makes Appx D 1.pdf
Tender Documents • 0.27 MB
8.5 List of Makes Appendix E (1).pdf
Tender Documents • 0.24 MB
8.6. Appendix F & G.pdf
Tender Documents • 0.11 MB
8.7. Appendix H.pdf
Tender Documents • 0.10 MB
9 List of Drg.pdf
Tender Documents • 0.03 MB
3. NIT.pdf
Tender Documents • 0.91 MB
2. Tender forwarding.pdf
Tender Documents • 0.29 MB
10. Appendix 'A' to DBR Soil Test Report_pagenumber (3).pdf
Tender Documents • 1.84 MB
BOQ_889185.xls
BOQ • 0.25 MB
126DUs Drawings.pdf
Additional Documents • 35.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .