Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹19.2 L+₹2.2 L (12.8%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹19.6 L+₹2.6 L (15.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹20.0 L+₹3.0 L (17.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹23.0 L+₹6.0 L (35.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
11 Aug 2026, 4:00 pmClosed
Executive Engineer RandB Division Budgam
Engineerig Complex Budgam
Providing of Basic Facilities for Imam Bargah Zianab Dargund Dandoosa Budgam
2026_PWDJK_319198_1
NIT_No_60_DB_2026-27
Open Tender
Civil Works
Percentage
60 days
Dargund
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Executive Engineer RandB Division Budgam
₹40,000
14 Aug 2026
3 Aug 2026
12 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced Cement Concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 ( 1cement : 1.5 coarse sand : 3 stone aggregate of 20mm normal size aggregate. | 57.97 | Cum | 9,821.8 | ₹5,69,369.75 |
| 2Centring and shuttering including strutting proping and removal of form work for | |||||
| 2.1 | Suspended floors, roofs, landings, balconies and acces. | 382.76 | Sqm | 718.2 | ₹2,74,898.23 |
| 2.2 | Columns,pillars,piers,abutments,posts and struts. | 67.61 | Sqm | 742.55 | ₹50,203.81 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position,binding and welding all complete upto and above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 8,115.6 | kg | 123.2 | ₹9,99,841.92 |
| 4 | P/F of PVC conduits/boxes modular for electric fittings | 155 | RM | 40 | ₹6,200 |
| 5Carriage of materails By Mech.Transport, from source to site of work incl. loading, unloading and stacking of materials at site of work. | |||||
| 5.01 | Sand for an avg lead of 12 km | 26.09 | Cum | 305.22 | ₹7,963.19 |
| 5.02 | Stone agg. for an avg lead of 10 km | 52.17 | Cum | 279.4 | ₹14,576.3 |
| 6 | Providing and making holes in RCC or PCC using an electrically operated hammer drill of suitable capacity including marking,drilling, to thec required diameter and depth ,removal of of dust and debris from the holes by compressed air or brushing ,complete with all labour, tools and tackes,equipment,electricity .loading/unloading and all incidental charges, complete in all respects as directed bi EIC. | 15 | Hrs | 1,750 | ₹26,250 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1056349.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .