| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance N A | NA | NA | 121004 | ₹3.2 L | L1 | Accepted-Finance L-1 |
| 2 | L2₹3.2 L+₹3,003.85 (0.95%)Rejected-Finance | ₹3.2 L+₹3,003.85 (0.95%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.2 L+₹4,505.78 (1.43%)Rejected-Finance | ₹3.2 L+₹4,505.78 (1.43%) | L3 | Rejected-Finance L3 |
Tender Value
₹3.0 L
EMD Value
₹3,003
Closing Date
2 Jul 2026, 9:00 amClosed
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
Tender for aug of existing 11/0.4kv,63 kva Sub-Station to 11/0.4kv,100 kva Sub-Station alongwith 3Ph LT Line at village Kuwari for SOP to HPShiva Project under ESD HPSEBL Thanakalan.
2026_HPSEB_137332_1
BID NO- UED/71/2026-27
Open Tender
Electrical Works
Percentage
90 days
village Kuwari for SOP to HPShiva Project under E
As per SBD
6 documents required · 6 mandatory
₹590
₹3,003
18 Jul 2026
23 Jun 2026
2 Jul 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | A) Erection Part | - | - | - | - |
| 1.02 | Erection of LT line. Digging of pit, erection of Steel pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. | 3 | Each | 2,784 | ₹8,352 |
| 1.03 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. | 3 | Set | 1,465 | ₹4,395 |
| 1.04 | Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect. | 3 | Set | 1,088 | ₹3,264 |
| 1.05 | Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect., | 0.53 | P/w / P/Kms | 12,784 | ₹6,711.6 |
| 1.06 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. | 0.13 | Kms. | 2,681 | ₹351.21 |
| 1.07 | Inspection fees for initial or peroodical inspection for LT Line | 1 | Job | 600 | ₹600 |
| 1.08 | Providing manual carriage and transportation of departmental materials from Central Store to the work site by the contractor at his own arrangement, including loading, unloading, handling, stacking, labour, tools & plants, transportation vehicles, fuel, watch and ward, and all other incidental charges complete in all respects as directed by the Engineer-in-Charge. | 1 | Job | 3,000 | ₹3,000 |
| 1.09 | ERECTION PART 11/0.4kV,100 KVA Sub-Station | - | - | - | - |
| 1.1 | rection of 100 kVA, 11/0.4 kV Distribution Transformer in place of existing 63 kVA Distribution Transformer by augmentation of the existing Sub-Station on the old structure, including dismantling of the existing transformer, lifting, mounting, fixing, connection of HT/LT jumpers, earthing connections, oil level checking, testing, commissioning, and all labour, tools & plants, tackles, consumables, and incidental charges required for complete and satisfactory execution of the work as directed by the Engineer-in-Charge | 1 | job | 26,000 | ₹26,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.09 MB
Tendernotice_2.pdf
PDF • 0.89 MB
BOQ_203244.xls
BOQ • 0.35 MB
corrIIbid71.pdf
PDF • 0.48 MB
corr71.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .