Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | ₹12.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹12.1 LRejected-AOC | ₹12.1 L | L2 | Rejected-AOC Rejected |
| 3 | L2₹12.1 LRejected-AOC AT JHANJIRMANGALA PO TELENGA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹12.1 L | L2 | Rejected-AOC Rejected |
Tender Value
₹12.1 L
EMD Value
₹12,100
Closing Date
6 Apr 2026, 5:00 pmClosed
Executive Engineer, CD-II
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Construction of culvert in different places at Arnapurna lane in Ward No. 29.
2026_ORULB_126613_5
MC(CMC)CTC_Div-IINo.36/2025-26
Open Tender
Civil Works - Others
60 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹12,100
Yes
2 Jun 2026
25 Mar 2026
9 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Removal of R.CC Slab from Drain and refixing the same after the work 1 is over etc. | ||||||
| 2Dismantling and removing R.C.C.columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead | ||||||
| 3Earthwork in all kinds of soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with all leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring, shuttering. dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc as required for the work complete as directed by the Engineer-in-charge. | ||||||
| 4Supplying and filling the foundation trenches in si o oudtoni pc & plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, coveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per the direction of EIC | ||||||
| 5Providing cement concrete for unreinforced cement concrete works of proportion (1.4:8) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position vibrating curing for days complete as per specification drawing and direction of the Engineer-in-charge | ||||||
| 6RCC work of M20 having minimum compressive strength (working stress) 200kg/cm2 in 15cm cubes at 28 days after mixing and test conducted in accordance with 1.5. 456 and LS 516 using 12mm to 20mm size (1/2" to 3/4") crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer-in-charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills Drain Wall Top Portion (15 cm) | ||||||
| 7 | Wall | 14.16 | Cum | - | - | BI01010001010000000000000515BI0100001127 |
| 8 | Desk Slab | 3.75 | Cum | - | - | BI01010001010000000000000515BI0100001128 |
| 9 | Slab | 20.16 | Cum | - | - | BI01010001010000000000000515BI0100001129 |
| 10Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/bent up MS Rods/Tor Steel/deformed rods etc. including hoisting. placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). | ||||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586314.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_586314.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid