| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹29.7 Cr−₹55.1 L (1.82%)Accepted-AOC 86 SECTOR 07 URBAN ESTATE KURUKSHETRA | L2 | Accepted-AOC Accept | |
| 2 | L1₹30.2 CrRejected-AOC | L1 | Rejected-AOC Reject | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Krishna Construction Co H2 | Aryana Infra H1 |
|---|---|---|---|---|---|
| 1.00 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 39.59 | cum | 3,500 ₹1,38,565 | 2,800 ₹1,10,852 Lowest |
| 2.00 | [11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [Through Rate] | 11,167.02 | Sqm | 25 ₹2,79,175.5 Lowest | 26 ₹2,90,342.52 |
| 3.00 | [11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 288.75 | Sqm | 100 ₹28,875 Lowest | 132 ₹38,115 |
| 4.00 | [13.28]Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. [Through Rate] | 2,89,686.25 | Kg. | 98 ₹2,83,89,252.5 | 90 ₹2,60,71,762.5 Lowest |
| 5.00 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 1,000 | Kg. | 100 ₹1,00,000 | 96 ₹96,000 Lowest |
| 6.00 | [15.1.1.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 1.1. Manual Means
Depth up to 3 m [Through Rate] | 5,003.47 | cum | 100 ₹5,00,347 Lowest | 179 ₹8,95,621.13 |
| 7.00 | [15.1.2.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.1. Mechanical Means
Depth up to 3 m [Through Rate] | 20,723.82 | cum | 100 ₹20,72,382 | 92 ₹19,06,591.44 Lowest |
| 8.00 | [15.1.2.2]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.2. Mechanical Means
Depth 3 m to 6 m [Through Rate] | 14,599.76 | cum | 100 ₹14,59,976 Lowest | 103 ₹15,03,775.28 |
| 9.00 | [15.1.2.3]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.3. Mechanical Means
Depth above 6m [Through Rate] | 6,676.33 | cum | 123 ₹8,21,188.59 Lowest | 128 ₹8,54,570.24 |
| 10.00 | [15.45]Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications MORTandH clause 1600 [Through Rate] | 163.81 | per tonne | 72,000 ₹1,17,94,320 | 65,000 ₹1,06,47,650 Lowest |
Tender Value
₹27.3 Cr
EMD Value
₹54.6 L
Closing Date
8 Apr 2025, 5:00 pmClosed
ADITYA DESWAL
Deputy General Manager -V HSRDC Faridabad
Construction of RUB at LC No. 576 on Delhi Mathura Railway Line Crossing Delhi Mathura Road to Mujesar in Faridabad District. CM Announcement Code No. 10206 dated 07.06.2015
2025_HBC_434561_1
2025850DD0F2 39D3 4E25 9041 5F90DDBCE8281156RBD
Open Tender
Civil Works
Works
540 days
Faridabad (MC)
As per Approved DNIT
2 documents required · 2 mandatory
₹20,000
₹54.6 L
Yes
Gurugram
8 Sept 2025
18 Mar 2025
9 Apr 2025
18 Mar 2025
8 Apr 2025
18 Mar 2025
18 Mar 2025 - 8 Apr 2025
26 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 39.59 | cum | - | - |
| 2 | [11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [Through Rate] | 11,167.02 | Sqm | - | - |
| 3 | [11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] | 288.75 | Sqm | - | - |
| 4 | [13.28]Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. [Through Rate] | 2,89,686.25 | Kg. | - | - |
| 5 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 1,000 | Kg. | - | - |
| 6 | [15.1.1.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 1.1. Manual Means
Depth up to 3 m [Through Rate] | 5,003.47 | cum | - | - |
| 7 | [15.1.2.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.1. Mechanical Means
Depth up to 3 m [Through Rate] | 20,723.82 | cum | - | - |
| 8 | [15.1.2.2]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.2. Mechanical Means
Depth 3 m to 6 m [Through Rate] | 14,599.76 | cum | - | - |
| 9 | [15.1.2.3]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.3. Mechanical Means
Depth above 6m [Through Rate] | 6,676.33 | cum | - | - |
| 10 | [15.45]Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications MORTandH clause 1600 [Through Rate] | 163.81 | per tonne | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_511745.xls
BOQ • 0.40 MB
166135045.pdf
Tender Documents • 1.23 MB
166135047.html
Tender Documents • 0.05 MB
OT0103753.pdf
Tender Documents • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .