Tender Value
₹31.3 L
EMD Value
₹62,660
Closing Date
5 Oct 2026, 6:00 pm
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER, MIRIK ENGINEERING DIVISION KRISHNA NAGAR, MIRIK-734214
Recovery and Reconstruction of road from Thurbo Rangbang Road (Naresh Rais House to Kiran tamangs House) at Thurbo Lower Division (Length 1.00 KM)
2026_GTA_5073831_7
NieT03/EE/MED/GTA/2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
Mirik
As per NieT
5 documents required · 5 mandatory
₹0
₹62,660
Yes
21 Sept 2026
21 Sept 2026
8 Oct 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Land Slide Clearance in Soil Clearance of land slides in soil and ordinary rock by abull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side. | 1,361.13 | m3 | 61.8 | ₹84,117.83 |
| 2 | Earthwork in excavation of foundation trenches in all sorts of soil ( including mixed soil but excluding stoney and moorum soil ) including removing, spreading or stacking the spoils within a lead of 150metres as directed and including trimming the sides of the trench levelling, dressing & ramming the bottom, bailing or pumping out water et. As required complete, depth of excavation exceeding 1 metre upto 2m below avrage bed lable at the site of excavation and requring shoring. | 460.14 | m3 | 114 | ₹52,455.96 |
| 3 | Plum concrete work with cement concrete (1:3:6) with 40% 30mm down graded stone metal 60% and stone boulder of size 150mm and above placed in position as directed excluding shuttering if any. | 446.87 | m3 | 3,304 | ₹14,76,458.48 |
| 4 | Providing formwork and staging including Hire & Labour charges for Abutment and its components and retaing wall and its components for Height Upto 3 metre clear span including stripping off and removing after completion of work as per specification and direction.a) where shoring not required | 320.29 | m2 | 214 | ₹68,542.06 |
| 5 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. | 137 | m3 | 1,958.05 | ₹2,68,252.85 |
| 6 | Earthwork in excavation of foundation trenches in all sorts of soil ( including mixed soil but excluding stoney and moorum soil ) including removing, spreading or stacking the spoils within a lead of 150metres as directed and including trimming the sides of the trench levelling, dressing & ramming the bottom, bailing or pumping out water et. As required complete, depth of excavation exceeding 1 metre upto 2m below avrage bed lable at the site of excavation and requring shoring. | 36.72 | m | 114 | ₹4,186.08 |
| 7 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 244.8 | m3 | 214.85 | ₹52,595.4 |
| 8 | Cement concrete with 30mm down graded shingles excluding shuttering with NB variety stone metal 1:3:6 proportion | 28.56 | m3 | 4,608 | ₹1,31,604.48 |
| 9 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor syructure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. | 122.4 | m2 | 214 | ₹26,193.6 |
| 10 | Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 36.75 | m3 | 1,934.11 | ₹71,078.54 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
Tendernotice_2.pdf
PDF • 1.32 MB
BOQ_5158830.xls
BOQ • 0.34 MB
GTAFORM.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .