Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC BARDHAMAN WEST BENGAL 713363 | BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹2.1 L+₹7,147.82 (3.50%)Rejected-Finance KUMARDIHI PANDERSWAR BARDHAMAN BARDHAMAN WEST BENGAL 713363 | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹2.1 L+₹10,211.17 (5.00%)Rejected-Finance SHANKARPUR PASCHIM BURDWAN 713363 | SHANKARPUR | PASCHIM BURDWAN | WEST BENGAL | 713363 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹2.0 L
EMD Value
₹2,600
Closing Date
21 Dec 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Shifting of pumps motor haulages with electrical switches and SDL machine UDM machine with electrical etc at no 1 incline of bankola colliery
2023_ECL_295828_1
ECL/GM/BA/E TENDER/23-24/EnM/172 Dt. 11.12.2023
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
Bankola Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹2,600
7 May 2024
11 Dec 2023
22 Dec 2023
11 Dec 2023
21 Dec 2023
11 Dec 2023
11 Dec 2023 - 15 Dec 2023
Amount
Item Description/ Heading
2(two) no's repairing pumps, motors transporting from Colliery workshop to No-1 incling surface & lowering the same UG lose golai & transporting up to 26L/0D & 25L/0D site & fitting the same & 2(two) no's defective pump lifting from 26L/0D to surface & transporting up to Colliery workshop for repairing
Shifting of 2(two) nos SDL 1(one) no UDM machine with electrical switch starter cable etc from RVIIT seam to RVIIB seam stowing panel-6 site.
Shifting of TSU with primary and secondery switch of TSU, etc from RVIIT top sec to RVIIB bottom stowing panel-6 site
2(two) no Tugger Haulage complete set (motor, Bedplate, Drump) transporting from RVIIT seam to RVIIB seam & transporting up to stowing panel-6 bottom & fitting the same
Total impact of GST for the purpose of CTC
MUKHERJEE ENTERPRISE
KALIDAS MONDAL
techsummary_306385.pdf
PDF • 0.85 MB
finsummary_306385.pdf
PDF • 0.85 MB
WOENM172.pdf
PDF • 1.23 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .