| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.6 L+₹80,100 (11.8%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-The Tenderer withdrawn his offer. |
| Sl No | Description | Qty | Unit | C.S.R ENTERPRISES L2 | Phoenix Engineering Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for carrying out shift duty operation work such as inspection and clearance given to coal handling control room operator to start the 3 nos secondary crusher , 3 nos vibrex screen, 9 nos belt feeder/shuttle feeder and arranging to attend the defects then and there in secondary crusher house-I - After starting the system inspection of all the running equipments and condition of system informed to CHS-3 operator to start coal feeding- Checking the output size of coal below 30 mm size in coal yard conveyor 28A & B by visual inspection - Gradual operation of cage frame adjusting mechanism to improve the fineness of coal - change the coal feeding either con 28A (or) 28 B coal yard conveyor by operating to move the flap gate direction as per the instruction of coal handling control room operator- checking the bearing temperate on both sides of RM-54 ring granulator, jack shaft drive/driven pulley and all feeder pulleys and temperature feeding to be entered in shift log book - Checking the oil level in crusher rotor bearing housing and all belt feeder/shuttle feeder gear boxes- and top up if necessary checking the condition of all the drive fluid coupling and connecting multidisc assembly bolts and inspect any oil spray noticed in the system - During coal feeding if any abnormalities found in system immediately stop the system and alternate stand by crusher and vibrex screen put in to service position – checking of all the running crushers & vibrex screen drive V belts, conveyor belt and adjusting the belt tension if necessary and arranging to attend the defects then and there in secondary crusher running equipments Assisting work for attending mechanical maintenance work in time to quick restoration of secondaty crusher and allied equipments - Supervision of all mechanical maintenance works in secondary crusher house-I - Isolation of equipments and guiding to follow the mechanical maintenance LC works - Condition of all the running equipments position informed to the field maintenance engineer incharge. All the shift duty operation activities are entered in the shift log book etc., complete. | 178 | Operation | 7,56,500 ₹8,92,670 | 6,76,400 ₹7,98,152 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,500
Closing Date
15 Oct 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
ECHP-I- Attending Secondary Crusher shift duty operation and allied work in 3 shifts such as inspection and operating the 3 Nos. Secondary coal crusher A,B,C, 3 Nos. Vibrex Screen 20A, B C, 9 Nos. Belt Feeder Shuttle Feeder, RBFD-20,21,SFD-4A,4B,5A
2025_EB_610318_1
CE/TTPS/SE/MI/156/2025-2026
Open Tender
Miscellaneous Works
Works
180 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,500
Yes
11 Dec 2025
30 Sept 2025
16 Oct 2025
30 Sept 2025
15 Oct 2025
30 Sept 2025
Charges for carrying out shift duty operation work such as inspection and clearance given to coal handling control room operator to start the 3 nos secondary crusher , 3 nos vibrex screen, 9 nos belt feeder/shuttle feeder and arranging to attend the defects then and there in secondary crusher house-I - After starting the system inspection of all the running equipments and condition of system informed to CHS-3 operator to start coal feeding- Checking the output size of coal below 30 mm size in coal yard conveyor 28A & B by visual inspection - Gradual operation of cage frame adjusting mechanism to improve the fineness of coal - change the coal feeding either con 28A (or) 28 B coal yard conveyor by operating to move the flap gate direction as per the instruction of coal handling control room operator- checking the bearing temperate on both sides of RM-54 ring granulator, jack shaft drive/driven pulley and all feeder pulleys and temperature feeding to be entered in shift log book - Checking the oil level in crusher rotor bearing housing and all belt feeder/shuttle feeder gear boxes- and top up if necessary checking the condition of all the drive fluid coupling and connecting multidisc assembly bolts and inspect any oil spray noticed in the system - During coal feeding if any abnormalities found in system immediately stop the system and alternate stand by crusher and vibrex screen put in to service position – checking of all the running crushers & vibrex screen drive V belts, conveyor belt and adjusting the belt tension if necessary and arranging to attend the defects then and there in secondary crusher running equipments Assisting work for attending mechanical maintenance work in time to quick restoration of secondaty crusher and allied equipments - Supervision of all mechanical maintenance works in secondary crusher house-I - Isolation of equipments and guiding to follow the mechanical maintenance LC works - Condition of all the running equipments position informed to the field maintenance engineer incharge. All the shift duty operation activities are entered in the shift log book etc., complete.
C.S.R ENTERPRISES (BID ID -1486784)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .