Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹8.2 L+₹10,207.15 (1.27%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹8.3 L+₹22,936.15 (2.85%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.S. INDUSTRIAL WORKS L1 | M/s Rupwati Contractor L3 | SHANKER TRADERS L2 |
|---|---|---|---|---|---|---|
| 1.00Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Balrampur to the work site/dump site (Distance up to 50 km) | ||||||
| 1.01 | PCC Poles (8.5 mtr long) | 62 | No | 600 ₹37,200 | 600 ₹37,200 | 550 ₹34,100 Lowest |
| 1.02 | ACSR Weasel Conductor | 2.09 | Km | 2,695 ₹5,632.55 Lowest | 2,800 ₹5,852 | 2,700 ₹5,643 |
| 1.03 | LT ABC 3x50+1x35+1x16sq.mm. | 3.1 | Km | 2,490 ₹7,719 Lowest | 2,500 ₹7,750 | 2,500 ₹7,750 |
| 1.04 | 25 KVA T/F | 31 | No | 1,950 ₹60,450 Lowest | 2,000 ₹62,000 | 2,000 ₹62,000 |
| 1.05 | 16 KVA T/F | 6 | No | 2,050 ₹12,300 Lowest | 2,100 ₹12,600 | 2,100 ₹12,600 |
| 1.06 | Other line materials | 18.6 | Qtl | 155 ₹2,883 Lowest | 160 ₹2,976 | 160 ₹2,976 |
| 2.00 | Erection of sectional double pole sectional PCC pole (8.5 mtr long PCC Pole) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. | 31 | No | 1,468 ₹45,508 Lowest | 1,470 ₹45,570 | 1,470 ₹45,570 |
| 3.00 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. | 62 | No | 448 ₹27,776 Lowest | 450 ₹27,900 | 450 ₹27,900 |
| 4.00 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. | 62 | No | 840 ₹52,080 Lowest | 850 ₹52,700 | 850 ₹52,700 |
Tender Value
₹8.2 L
EMD Value
₹8,200
Closing Date
1 Sept 2026, 12:00 pmClosed
se edc balrampur
office se edc balrampur
33/EDC(BLP)/2026-27
2026_MVVNL_1178564_2
NVS-32-35/EDC(BLP)/2026-27
Open Tender
Electrical Works
Item Rate
90 days
Balrampur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
se edc blp
₹8,200
3 Sept 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Balrampur to the work site/dump site (Distance up to 50 km) | |||||
| 1.01 | PCC Poles (8.5 mtr long) | 62 | No | 1.25 | ₹77.5 |
| 1.02 | ACSR Weasel Conductor | 1 | Km | 1.25 | ₹1.25 |
| 1.03 | LT ABC 3x50+1x35+1x16sq.mm. | - | Km | 1.25 | - |
| 1.04 | 25 KVA T/F | 31 | No | 1.25 | ₹38.75 |
| 1.05 | 16 KVA T/F | 6 | No | 1.25 | ₹7.5 |
| 1.06 | Other line materials | - | Qtl | 1.25 | - |
| 2 | Erection of sectional double pole sectional PCC pole (8.5 mtr long PCC Pole) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. | 31 | No | 1.25 | ₹38.75 |
| 3 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. | 62 | No | 1.25 | ₹77.5 |
| 4 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. | 62 | No | 1.25 | ₹77.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
33.pdf
Tender Documents • 1.57 MB
BOQ_2215048.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .