Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Fee/PreQual/Technical/Finance KATRA BUS STAND NIHARIKA BHAWAN BAN GANGA ROAD KATRA REASI | REASI | JAMMU AND KASHMIR | 182301 | -30.05% | ₹5.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.4 LAdmitted-Fee/PreQual/Technical/Finance | -30.00% | ₹5.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.1 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹6.1 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹6.1 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹6.1 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.7 L
EMD Value
₹15,320
Closing Date
21 Aug 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_320222_35
e-NIT No. 97 REW UDHAMPUR of 2026-27 Dated 08-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹15,320
27 Aug 2026
11 Aug 2026
22 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 31.71 | cum | 479.3 | ₹15,198.6 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 10.32 | cum | 4,826.5 | ₹49,809.48 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 14.54 | CUM | 5,733.6 | ₹83,366.54 |
| 4 | P/L 1:1.5:3 mix using 20 mm aggregate curing complete | 3.96 | cum | 7,275.25 | ₹28,809.99 |
| 5 | P/L RCC 1:2:4 mix using 20 mm aggregate and curing complete | 4.16 | cum | 6,591.25 | ₹27,419.6 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,270 | kg | 138.2 | ₹3,13,714 |
| 7 | Providing ridges or hips of width 60cm overall width (0.50mm thick) | 12.8 | rmt | 690.85 | ₹8,842.88 |
| 8 | A) Foundations, footings, bases of columns etc. for mass concrete. | 65.48 | SQM | 286.35 | ₹18,750.2 |
| 9 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required(0.50 mm thick) | 93.68 | SQM | 852.5 | ₹79,862.2 |
| 10 | a) Cement | 7.04 | MT | 1,610.35 | ₹11,336.86 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1063702.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].