Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC NAN | ₹2.8 Cr | L1 | Accepted-AOC first lowest |
| 2 | L2₹3.1 Cr+₹31.5 L (11.3%)Rejected-Finance | ₹3.1 Cr+₹31.5 L (11.3%) | L2 | Rejected-Finance l2 |
| 3 | Rejected-Technical 11 13 7 TASKAND ROAD CIVIL LINES PRAYAGRAJ | - | - | Rejected-Technical document incomplete |
| 4 | Rejected-Technical | - | - | Rejected-Technical document incomplete |
| 5 | Rejected-Technical | - | - | Rejected-Technical document incomplete |
Tender Value
Refer Docs
EMD Value
₹6.3 L
Closing Date
15 Jan 2025, 3:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAZARIYA, MAHOBA
Balance earth work from km. 0.00to 20.400 and Construction of VRB. At Km. 1.350, fall at Km. 9.700 of Khandeh DY off taking from km. 4.800 of Kabrai Main Canal.(Lot-1)
2025_UPIDC_989927_1
11/SE/2024-25
Open Tender
Civil Works
Item Rate
120 days
MAHOBA
as per tender document and Nit.
2 documents required · 2 mandatory
₹6,406
₹6.3 L
27 Mar 2025
4 Jan 2025
15 Jan 2025
4 Jan 2025
15 Jan 2025
4 Jan 2025
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rate are excluding GST)
Earth work in Excavation in making canal section in all type of starta excluding hard granite rock including compaction, dressing, watering and disposal of excavated material as directed by Engineer in charge including all lift and T&P etc for proper completion of job..But excluding GST
Earth work in filling in embankment including mechanical compaction dressing and watering with all leads and lifts and T&P etc. for proper compaction of work including all tax like income tax labour cess etc but excluding G.S.T.
E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. But excluding GST.
Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc . All complete. But excluding GST.
Laying C.C. work 1:2:4 (M-15) IN foundation with all cost of sand,cement,& stone ballast T&P etc required for completion of work..But excluding GST
Laying C.C. work 1:1.5:3 (M-20) IN slab with all cost of sand,cement,& stone ballast T&P etc required for completion of work..But excluding GST
Laying C.C. work 1:1:2 (M-25) IN slab with all cost of sand,cement,& stone ballast T&P etc required for completion of work..But excluding GST
Steel Reinforcement for R.C.C work including cutting, placing & binding with GI wire and placing in position with cost of steel reinforcement..But excluding GST
Dry stone pitching with all cost of labour material T&P etc.required for completion of work..But excluding GST
Centering and Shuttering of R.C.C. Work with all cost of labour material T&P etc. required for completion of work. .But excluding GST
Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST.
R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work.But excluding GST.
Cement pointing in 1:2 cement mortor including all cost of material, labour, T&P etc. required for completion of work..But excluding GST
M/S VIVEK KUMAR SINGH (BID ID -4851163)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .