| 1 | L1₹18.5 LAccepted-AOC CHHOTI LINE B 5 160 A 3 CHHOTI LINE YAMUNA NAGAR 135001 | YAMUNA NAGAR | YAMUNANAGAR | HARYANA | 135001 | ₹18.5 L | L1 | Accepted-AOC wa |
| 2 | L2₹25.5 L+₹7.0 L (38.1%)Rejected-AOC GANGA NAGAR COLONY 1251 B GANGA NAGAR COLONY JAGADHRI 135003 | JAGADHRI | YAMUNANAGAR | HARYANA | 135003 | ₹25.5 L+₹7.0 L (38.1%) | L2 | Rejected-AOC wna |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹26.8 L
EMD Value
₹53,540
Closing Date
6 Feb 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
Interlock paver block including lean concrete, const. of road gullys, inspection chambers, earth filling
2026_HBC_499993_1
202674FB16B4 6C1B 41F9 B347 4F1FE1DC6008240HSV
Open Tender
Civil Works
Works
60 days
Jagadhari
2 documents required · 2 mandatory
₹1,000
₹53,540
Yes
6 May 2026
31 Jan 2026
7 Feb 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
[11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand) [Through Rate]
[17.4]Scarifying Existing Bituminous Surface to a depth of 50 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead up to 1000 metres, as per technical clause 202 of MORT&H specifications [Through Rate]
[17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[21.84.1]Constructing brick masonry inspection Chamber sizes as given below up to 0.60 metre average depth in cement mortar 1:5 lime concrete with 40 per cent lime mortar 2:3 in foundation cement concrete 1:2:4 benching 12mm thick cement plaster 1:2 with a floating coat of 1 mm thick of neat cement R.C.C. 1:2:4 slab 100 mm thick/cement concrete topping, 50mm thick with 455mmx455mm / 455mm x610mm inside light duty C.I. inspection chamber cover and frame weight as per I.S.I. specification painted with 3 coats of black bitumastic superior paint complete as per standard design. 1. Size 450 mm X450 mm inside (with 455 mm x 455 mm cover and frame light duty single seal weighing 20 kg with C.C. topping [Through Rate]
[21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate]
[22.205.1]Constructing brick masonry road gully chamber 50x45x60 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm pre-cast R.C.C. horizontal grating with frame complete as per standard design : 1. With common burnt clay non-modular bricks of class designation 7.5 [Through Rate]
[5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [Through Rate]
[5.70]Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.30.16.1]Centering and shuttering including strutting, propping etc. and removal of form for 16.1. Edges of slabs and breaks in floors and walls Under 20 cm wide [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_578593.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .