| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.8 LAdmitted-Finance | -46.86% | ₹19.8 L | L1 | Admitted-Finance |
| 2 | L2₹26.5 L+₹6.7 L (33.6%)Admitted-Finance | -28.99% | ₹26.5 L+₹6.7 L (33.6%) | L2 | Admitted-Finance |
| 3 | L3₹27.2 L+₹7.4 L (37.4%)Admitted-Finance | -27.00% | ₹27.2 L+₹7.4 L (37.4%) | L3 | Admitted-Finance |
Tender Value
₹37.3 L
EMD Value
₹74,620
Closing Date
25 May 2026, 2:00 pmClosed
commissioner
Townhall municipal corporation Alwar
Drain construction work in Ward No. 33 Chor Dungri Rambaksh Colony
2026_DLB_559156_1
Nit 04/2026-27 wno 3
Open Tender
Civil Works
Percentage
60 days
municipal corporation Alwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
commissioner municipal corporation Alwar
₹74,620
30 Jun 2026
15 May 2026
25 May 2026
15 May 2026
25 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | 270 | Cum | 678 | ₹1,83,060 |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m | 918 | cum | 229.5 | ₹2,10,681 |
| 3 | Carriage of Materials by mechanical transport including loading,unloading And stacking Earth (3km) | 1,080 | Cum | 209.35 | ₹2,26,098 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : | |||||
| 4.1 | 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size) | 229.5 | Cum | 4,575 | ₹10,49,962.5 |
| 4.2 | 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 76.5 | cum | 5,910 | ₹4,52,115 |
| 5 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 156.4 | cum | 5,400 | ₹8,44,560 |
| 6 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 19 | Cum | 4,860 | ₹92,340 |
| 7 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : 1:4 (1 cement : 4 fine/ coarse sand) | 1,280 | Sqm. | 315.5 | ₹4,03,840 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.25 | Cum | 6,340 | ₹71,325 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
BOQ_995557.xls
BOQ • 2.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .