Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹4.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹4.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹4.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹4.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.5 L
EMD Value
₹55,425
Closing Date
2 Sept 2026, 3:00 pmClosed
Chief Engineer
CE Office, Nagar Nigam Kanpur
Construction of Shade in Indra Park Situated in ward 92 Zone-3.
2026_NNKAN_1180420_1
300/UDYAN/2026-27
Open Tender
Civil Works
Fixed-rate
45 days
Kidwai Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹55,425
14 Sept 2026
28 Aug 2026
2 Sept 2026
28 Aug 2026
2 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in Excavation in trenches for foundation pipe
cable in ordinary soil including 1.5left and 50m and dressing of side and ramming of bottom and disposal of surplus axcavated earth Earth work in
execavation in foundation and under plinth area lift 1.5 m lead 30 m with all charges complete.-Rate-174 per 1 Cum. | - | Cum | 174 | - |
| 2 | Providing and laying In position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level 1:6:12 (1 cement : 6 coarse sand (zone-Ill): 12 graded Brick aggregate 40 mm (nominal size)-Rate-4380 per 1
Cum | - | Cum | 4,380 | - |
| 3 | Providing and laying In position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded stone aggregate 20 mm nominal size)-Rate-6750 per 1
Cum. | - | Cum | 6,750 | - |
| 4 | Providing and fixing hand rail (M.S. tube) of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. Providing and fixing hand rail ( M.S. tube) of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.- Rate-119.00 per 1 kg | 1 | Kg | 119 | ₹118.99 |
| 5 | "Providing & fixing UV stablllsed fiberglass relnforced plastic sheet roofing up to any pitch, including fixing with polymer coated 'J' or 'L' hooks, bolts & nuts 8mm dia. G.l plain/bitumen washers
complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-vlolet stabiliser in resin system under approximately 2400 PSI and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866.The sheets Shali be opaque or translucent, clear or pigmented, textured or smooth as specified. 2 mm thick corrugated (2.5"" or 4.2"" or 6u) or step-down (21' or 3"" or 6"" ) as specified." "Providing & fixing UV stablllsed fiberglass relnforced plastic sheet roofing up to any pitch, including fixing with polymer coated 'J' or 'L' hooks, bolts & nuts 8mm dia. G.l plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-vlolet stabiliser in resin system under approximately 2400 PSI and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866.The sheets Shali be opaque or translucent, clear or pigmented, textured or smooth as specified. 2 mm thick corrugated (2.5"" or 4.2"" or 6u) or step-down (21' or 3"" or 6"" ) as specified."- Rate-880.00 per 1 Sqm | 0.6 | Kg | 880 | ₹527.99 |
| 6 | Painting 1st coat over priming coat but Excluding cost of priming coat on etc of complition of work. Painting 1st coat over priming coat but Excluding cost of priming coat on etc of completion of work.-
Rate-71.00 per 1 Sqm. | 1 | Sqm | 71 | ₹71 |
| 7 | GST 18% | - | Tax | 84,546.41 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.46 MB
BOQ_2219615.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .