Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83,413.02Accepted-AOC C O MADAN ORAON SARVODAY NAGAR DAM SIDE HATHIYA GONDA KANKE RAOAD RANCHI 08 KANKE ROAD RANCHI | L1 | Accepted-AOC As per TCR | |
| 2 | L2₹72,150+₹1,461 (2.07%)Rejected-Finance | L2 | Rejected-Finance As per TCR | |
| 3 | L3₹75,000+₹4,311 (6.10%)Rejected-Finance AT RIVER SIDE BHURKUNDA DIST RAMGARH | BHURKUNDA | RAMGARH | L3 | Rejected-Finance As per TCR |
Tender Value
₹77,986
EMD Value
₹1,000
Closing Date
18 Jan 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Engineer (EnM),Urimari OCP
Office of The Project Engineer (EnM),Urimari OCP, Barka Sayal Area, Pin 825311
Repairing, reconditioning and spares changing for Fluid coupling of Elecon make Feeder Breaker installed at Potanga under Urimari OCP.
2023_CCL_267080_1
PE(EnM)/Urimari/e Tender/22-23/70 Dated 09/01/2023
Open Tender
Electrical and Maintenance Works
Item Wise
10 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹1,000
1 May 2023
10 Jan 2023
19 Jan 2023
11 Jan 2023
18 Jan 2023
11 Jan 2023
11 Jan 2023 - 16 Jan 2023
Amount
Cost of complete dismantling of fluid coupling manually and by hydraulic press machine as per requirement and specification
Cost of complete repairing of casing by Gas tungsten arc(GTA) welding, grinding, machining as per requirement and specification
Cost of repairing of all damaged body thread and fabrication of 6 nos of fusual plug for fluid coupling as per specification
Cost of complete repairing of main shaft with turning, welding, machining all size making etc. as per measurement and specification
Cost of replacement of all damaged oil seal, bolt, nuts, washer, O ring gasket, oil packing paper for fitting of fluid coupling
Cost of fabrication and fitting of new fluid coupling cooling fan
Cost of complete assembling of fluid coupling with all required spare and internal component and balancing dynamically as per specification
Total impact of GST for the purpose of CTC
Dolphin Engineering
M/S DK ENTERPRISES
stage.html
html • 0.04 MB
techsummary_276313.pdf
PDF • 0.39 MB
finsummary_276313.pdf
PDF • 0.39 MB
LOAEtender70.pdf
PDF • 0.35 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .