| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | -0.50% | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹10.6 L+₹5,317.35 (0.50%)Admitted-Finance | +0.00% | ₹10.6 L+₹5,317.35 (0.50%) | L2 | Admitted-Finance |
| 3 | L3₹10.9 L+₹28,926.37 (2.73%)Admitted-Finance | +2.22% | ₹10.9 L+₹28,926.37 (2.73%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.6 L
EMD Value
₹21,260
Closing Date
16 May 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer PWD (RB) Division JMC Jammu
Repair and Rennovation of JMC flat allotted to Hindi Sahitya Mandal, near Shaheed Bhagat Singh Park, Krishna Nagar ward no. 12 Jammu.
2026_HAUDD_309112_1
PWD(RB)DIVJMC/07 of 2026-27 Dated-30-04-2026
Open Tender
Civil Works
Percentage
90 days
ward no 12
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD (RB) Division JMC Jammu
₹21,260
25 May 2026
30 Apr 2026
16 May 2026
30 Apr 2026
16 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable In cement mortar | 5.07 | Cum | 1,458.45 | ₹7,394.34 |
| 2 | Demolishing R.C.C. Work manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: | 0.39 | Cum | 2,516.85 | ₹981.57 |
| 3 | Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50
meters lead. | 132.99 | sqm | 83.45 | ₹11,098.02 |
| 4 | Demolishing mud phaska in terracing and disposal of material within 50 meters lead | 132.99 | sqm | 647.15 | ₹86,064.48 |
| 5 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound
consisting of applying :
(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm.
(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.
(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around.
(d) fourth and final layer of brick tiling with cement mortar (which will
be paid for separately)
For the purpose of measurement the entire treated surface will be
measured. | 132.99 | sqm | 556.2 | ₹73,969.04 |
| 6 | 10cm thick (average) mud phaska of damped brick earth on roofs laid to
slope consolidated and plastered with 25 mm thick mud mortar mixed with bhusa at 35kg per cum of earth and gobri leaping with mix 1:1 (1
clay: 1 cow dung) and covered with specified tile bricks grouted with cement mortar 1:3 (1 cement: 3 fine sand) mixed with 2% of integral water
proofing compound by weight of cement and finishing neat. With common burnt clay (non modular) brick tiles of class designation 10.0 | 132.99 | sqm | 1,063.8 | ₹1,41,474.76 |
| 7 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement: 2 coarse
sand: 4 stone aggregate 10 mm and down gauge), including finishing with
cement mortar 1:3 (1 cement: 3 fine sand) as per standard design. In 75x75
mm deep chase. | 65 | mtr | 241.45 | ₹15,694.25 |
| 8 | Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate
of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement: 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the
outlet complete. | 4 | no | 262.9 | ₹1,051.6 |
| 9 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings. This includes jointing of pipes
and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-charge.Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all
CPVC plain and brass threaded fittings. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-charge. Internal work Concealed fixing the pipe with clamps at 1.00 meter spacing including cutting chases and making good the wall etc. 15mm nominal outer dia pipes | 60 | mtr | 419.75 | ₹25,185 |
| 10 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings. This includes jointing of pipes
and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-charge.Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all
CPVC plain and brass threaded fittings. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-charge. Internal work Concealed fixing the pipe with clamps at 1.00 meter spacing including cutting chases and making good the wall etc. 20mm nominal outer dia pipes | 60 | mtr | 492.35 | ₹29,541 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1000913.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .