| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.9 L+₹29,907.37 (11.5%)Rejected-AOC GRAM KASADDA POST SUGAV MAINPURI | MAINPURI | UTTAR PRADESH | 205001 | 2 | Rejected-AOC L2 | |
| 3 | 3₹2.9 L+₹32,622.13 (12.5%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 4 | 4₹2.9 L+₹32,723.48 (12.5%)Rejected-Finance 537 KHERA MOHALLA SHIKOHABAD FIROZABAD | SHIKOHABAD | FIROZABAD | UTTAR PRADESH | 4 | Rejected-Finance L4 | |
| 5 | 5₹3.0 L+₹43,165.40 (16.5%)Rejected-Finance | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s LATURI SINGH CONTRACTOR & SUPPLIERS L5 | SHREE SHYAMLA TRADERS L7 | M/S N.S. CONSTRUCTION L3 | Harendra kumar thekedar L4 | M/S MAYA CONSTRUCTION L1 | M/s CHANDRA PAL SINGH L6 | M/s SANJEEV KUMAR SINGH CONTRACTOR AND SUPPLIERS L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lift up to 1.5 m and lead up to 30 m by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-charge. (a) Drains (with out compaction and light dressing. | 7,998.33 | Cum | 33 ₹2,63,944.89 | 40 ₹3,19,933.2 | 27 ₹2,15,954.91 | 30 ₹2,39,949.9 | 28 ₹2,23,953.24 | 32 ₹2,55,946.56 | 26.67 ₹2,13,315.46 Lowest |
| 2.00 | Uprooting jhunds and moonj with disposal away from site. | 1,875 | sqm | 7 ₹13,125 | 30 ₹56,250 | 18 ₹33,750 | 5 ₹9,375 Lowest | 7 ₹13,125 | 5 ₹9,375 Lowest | 18.97 ₹35,568.75 |
| 3.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge | 1.24 | cum | 282.31 ₹350.06 | 6,500 ₹8,060 | 260 ₹322.4 | 518 ₹642.32 | 150 ₹186 | 100 ₹124 Lowest | 251 ₹311.24 |
| 4.00 | Ist class brick work (M 15) in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc | 9.13 | Cum | 1,200 ₹10,956 Lowest | 6,500 ₹59,345 | 2,900 ₹26,477 | 2,500 ₹22,825 | 1,200 ₹10,956 Lowest | 4,400 ₹40,172 | 2,800 ₹25,564 |
| 5.00 | Cement Pointing on Brick work with cement mortar 1:2 (1cement:2 sand). | 36.18 | Sqm | 76 ₹2,749.68 | 200 ₹7,236 | 70 ₹2,532.6 | 141 ₹5,101.38 | 141 ₹5,101.38 | 50 ₹1,809 Lowest | 68.51 ₹2,478.69 |
| 6.00 | C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc . | 0.94 | cum | 1,200 ₹1,128 Lowest | 6,500 ₹6,110 | 3,600 ₹3,384 | 3,000 ₹2,820 | 1,200 ₹1,128 Lowest | 3,000 ₹2,820 | 3,244 ₹3,049.36 |
| 7.00 | Wall painting on two coat with plastic emulsion paint of approved brand and manufacture on decorative wall surface two give an even shade including thoroughly bruising the surface clean all of dirt ,grease loose pies and prepare smooth | 129.19 | Sqm | 91.5 ₹11,820.89 | 200 ₹25,838 | 86 ₹11,110.34 | 100 ₹12,919 | 50 ₹6,459.5 Lowest | 50 ₹6,459.5 Lowest | 81.5 ₹10,528.99 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
23 May 2026, 2:00 pmClosed
Executive Engineer
ICD Firozabad HQ Shikohabad
Repair of Pacca Structure and Clearance of Madanpur Drain from Km 0.000 to 7.242
2026_UPIDC_1149134_1
02/EE/2026-27/06
Open Tender
Civil Works - Canal
Item Rate
15 days
Surajpur Drain
Please refer tender documents
2 documents required · 2 mandatory
₹266
₹12,000
11 Jun 2026
16 May 2026
23 May 2026
16 May 2026
23 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance including lift up to 1.5 m and lead up to 30 m by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-charge. (a) Drains (with out compaction and light dressing. | 1 | Cum | - | - |
| 2 | Uprooting jhunds and moonj with disposal away from site. | - | sqm | - | - |
| 3 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge | - | cum | - | - |
| 4 | Ist class brick work (M 15) in 1:4 C.M. cement and coarse sand including cost of all materials, Labour and T& P etc | - | Cum | - | - |
| 5 | Cement Pointing on Brick work with cement mortar 1:2 (1cement:2 sand). | 1 | Sqm | - | - |
| 6 | C.C in 1:1.5:3 (M 200) with cement, coarse sand , and stone grit 10-20 mm. including cost of all materials labour T&P complete etc . | - | cum | - | - |
| 7 | Wall painting on two coat with plastic emulsion paint of approved brand and manufacture on decorative wall surface two give an even shade including thoroughly bruising the surface clean all of dirt ,grease loose pies and prepare smooth | 1 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.16 MB
6.pdf
Tender Documents • 3.29 MB
BOQ_2151180.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .