Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.5 CrAccepted-AOC | ₹3.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.6 Cr+₹5.9 L (1.66%)Rejected-Finance | ₹3.6 Cr+₹5.9 L (1.66%) | L-2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | - | - | Rejected-Technical All Bid Rejected in Technical Evaluation |
| Sl No | Description | Qty | Unit | VIVEK KUMAR SINGH THEKEDAR L1 | M/S SURESH CHANDRA GUPTA L2 |
|---|---|---|---|---|---|
| 1.00 | Cutting heavy under growth & bushes up to 7.50 cm removing & Including uprooting with collection & disposal i/c cost of all labour t&p etc as per direction in charge. | 19,011.65 | M2 | 5 ₹95,058.25 | 4.15 ₹78,898.35 Lowest |
| 2.00 | Cutting heavy under growth trees from 7.5 cm. to 20 cm. dia, including removing roots with collection & removal | 8,147.85 | M2 | 29 ₹2,36,287.65 | 22.05 ₹1,79,660.09 Lowest |
| 3.00 | Earth work by Power transported earth with a lead beyond 200m and upto 1.0 km including excavation, loading, unloading, manual compaction, dressing and all lift complete. | 49,946.4 | M3 | 40 ₹19,97,856 Lowest | 166.1 ₹82,96,097.04 |
| 4.00 | Earth work in Mar, Rankar and kankar mixed soils in foundation of walls, piers, abutments etc.with disposal with in 30-m lead and 1.5 m. including dressing making profile and manual compaction but excluding mechanical compaction. | 3,393.89 | M3 | 90 ₹3,05,450.1 | 70.14 ₹2,38,047.44 Lowest |
| 5.00 | Dismentaling of Brick or Stone Masonary in lime or Cement mortar | 27.19 | M3 | 460 ₹12,507.4 | 354.25 ₹9,632.06 Lowest |
| 6.00 | Laying M-10 P.C.C. 1:3:6 (cement, coarse sand & 22.4-53mm stone ballast) in foundation all cost of labour material and T&P etc. complete work as per direction of Engineer-in charge. | 818.81 | M3 | 4,500 ₹36,84,645 | 3,475.7 ₹28,45,937.92 Lowest |
| 7.00 | Centering & shuttering for C.C. work including all materials & T&P etc.complete work as per direction of Engineer-in charge. | 1,723.59 | M2 | 300 ₹5,17,077 | 236.16 ₹4,07,043.01 Lowest |
| 8.00 | Laying C.C M-20 1:1.5:3 in (cement, coarse sand and 11.20mm to 19mm graded stone grit) including all cost of labour, material and T&P etc. complete work as per direction of Engineer-in charge. | 310.78 | M3 | 6,000 ₹18,64,680 | 4,585.64 ₹14,25,125.2 Lowest |
| 9.00 | Providing, laying. spreading and compacting coarse sand in uniform layer over compacted thickness on a prepared base including all material, machinery. labour and T&P etc complete. | 126.6 | M3 | 2,100 ₹2,65,860 | 1,694.24 ₹2,14,490.78 Lowest |
| 10.00 | Providing and laying of Grouted Stone pitching of size 25-60 kg boulder in 1:3 Cement mortar including all labour T&P etc. complete work as per direction of Engineer-in charge. | 469 | M2 | 2,100 ₹9,84,900 | 1,695.84 ₹7,95,348.96 Lowest |
Tender Value
₹4.8 Cr
EMD Value
₹9.5 L
Closing Date
3 Aug 2026, 2:30 pmClosed
Supertending Engineer
Irrigation Work Circle Banda
Restoration work of Pindari Rajwaha Distributary, originating from Chandrawal Dam under the control of Irrigation Division Mahoba, from km 0.000 to km 12.865 (LOT-04)
2026_UPIDC_1170899_1
08/SE/2026-27 dt 09-07-2026
Open Tender
Civil Works
Item Wise
300 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹9.5 L
Irrigation Work Circle Banda
3 Sept 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting heavy under growth & bushes up to 7.50 cm removing & Including uprooting with collection & disposal i/c cost of all labour t&p etc as per direction in charge. | - | M2 | 5.5 | - |
| 2 | Cutting heavy under growth trees from 7.5 cm. to 20 cm. dia, including removing roots with collection & removal | - | M2 | 29.2 | - |
| 3 | Earth work by Power transported earth with a lead beyond 200m and upto 1.0 km including excavation, loading, unloading, manual compaction, dressing and all lift complete. | - | M3 | 220 | - |
| 4 | Earth work in Mar, Rankar and kankar mixed soils in foundation of walls, piers, abutments etc.with disposal with in 30-m lead and 1.5 m. including dressing making profile and manual compaction but excluding mechanical compaction. | 1 | M3 | 92.9 | ₹92.81 |
| 5 | Dismentaling of Brick or Stone Masonary in lime or Cement mortar | - | M3 | 469.2 | - |
| 6 | Laying M-10 P.C.C. 1:3:6 (cement, coarse sand & 22.4-53mm stone ballast) in foundation all cost of labour material and T&P etc. complete work as per direction of Engineer-in charge. | 1 | M3 | 4,603.57 | ₹4,598.97 |
| 7 | Centering & shuttering for C.C. work including all materials & T&P etc.complete work as per direction of Engineer-in charge. | 1 | M2 | 312.8 | ₹312.49 |
| 8 | Laying C.C M-20 1:1.5:3 in (cement, coarse sand and 11.20mm to 19mm graded stone grit) including all cost of labour, material and T&P etc. complete work as per direction of Engineer-in charge. | 1 | M3 | 6,073.7 | ₹6,067.63 |
| 9 | Providing, laying. spreading and compacting coarse sand in uniform layer over compacted thickness on a prepared base including all material, machinery. labour and T&P etc complete. | 1 | M3 | 2,244.03 | ₹2,241.79 |
| 10 | Providing and laying of Grouted Stone pitching of size 25-60 kg boulder in 1:3 Cement mortar including all labour T&P etc. complete work as per direction of Engineer-in charge. | - | M2 | 2,246.15 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
BOQ_2197525.xls
BOQ • 0.36 MB
TD.pdf
Tender Documents • 2.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .