Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.7 LAccepted-AOC | L1 | Accepted-AOC Lowest Tender | |
| 2 | L2₹54,000Same as L1Rejected-Finance | L2 | Rejected-Finance By Commissioner Order |
Tender Value
₹87.6 L
EMD Value
₹54,000
Closing Date
30 Aug 2023, 3:00 pmClosed
Executive Officer
Arulmigu Agastheeswarar Temple at Melathanium Village Ponnamaravathy Thaluk Pudukkottai District
Repair And Renovation Of Arulmigu Agastheeswarar Temple at Melathanium Village Ponnamaravathy Thaluk Pudukkottai District
2023_HRCE_351327_1
2/2023
Open Tender
Civil Works - Others
Item Rate
365 days
Arulmigu Agastheeswarar Temple at Melathanium Vill
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹54,000
8 Jan 2024
28 Jul 2023
30 Aug 2023
28 Jul 2023
30 Aug 2023
28 Jul 2023
Amount
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of Lime concrete weathering course inclusive of hire charges of all tools and plants employed,scaffolding arrangements,conveyance charges of all materials to other site and labour for work etc.complete as per standard specifications.
Labour charges for Dismantling the Existing cut stone Structure including, Numbering all labour charges,hire for all tools and plants for employed, scaffolding charges handling charges hoisting and stacking them in the places shown by the Departmental Officers etc., complete.,as per standard specification.
Labour charges for Refixing the Existing cut stone Structure including,all labour charges,hire for all tools and plants for employed, scaffolding charges handling charges hoisting and fixing in position as directed by the Departmental Officers etc complete.,as per standard specification.
Labour charges for Sungen pointing the Existing cut stone Structure including,all labour charges,hire for all tools and plants for employed, scaffolding charges handling charges hoisting and fixing in position as directed by the Departmental Officers etc., complete as per standard specification.
Earth work excavation for foundation with all leads and lifts in all soils and sub-soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 150mm thick well consolidated, depositing the surplus earth in places shown and levelling the site with all leads and lifts etc. complete in all respects
Supplying And Filling in foundation and basement with filling sand in layers of not exceeding 15 cm thick well watered, rammed and consolidated complying with relevant standard specification including the cost of supplying filling m-sand etc., complete in all respects as directed by the departmental officers
Cement concrete 1:5:10 (one of cement, five of sand and ten of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc.,complete in all respects as directed by the departmental officers.
Supplying of cut stone for walls, Pillar , Pavukkal , Uthiram , Bodiyal and all works excluding labour charges but including cost and conveyance loding and unloding etc. complete with standard specification
Dressing & Fixing with Pattiyalkal at the top of RR masonry with cut stone of 0.15m thick and both side surface dressed, pointing with Cement Mortar1:3 (One Cement Three Sand)including cost and conveyance of all materials etc., complete as per standard specifications.
Brick work in combination Mortor 1:1:6(One Cement One Lime And Six Part Of Sand) using Country brick of size 83/4"x41/4"x21/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specification.
Plastering with Combination Mortor1:1:5(One Part Of Cement One Part Of Lime And Five Part of Sand),12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
Plastering With Lime Morter 1:1.3(One Lime One and three of sand) ,20mm thick Over Wethering Coarse
Supplying & Paving flooring with cut stone of size 0.60 x .60M and 10m thick and top surface dressed, pointing with Combination Mortar1:1:5 (One Part Of Cement ,One Part of Lime And Five Part Of Sand)including cost and conveyance of all materials etc., complete as per standard specifications.
Weathering course in concrete broken brick jelly 20mm size in pure slacked lime over RCC roof slab the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required,well beaten with wooden beater etc., complete with standard specifications.he lime used should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry works.
sub total
K. SIVASUBRAMANIYAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_418869.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .