| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC GARHI NAGAR SAHI AGRA | AGRA | UTTAR PRADESH | 282001 | ₹2.8 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 27579962.00 Only |
| 2 | L2₹3.0 Cr+₹21.6 L (7.83%)Rejected-Finance | ₹3.0 Cr+₹21.6 L (7.83%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹3.2 Cr+₹41.0 L (14.9%)Rejected-Finance 33 73 LATAKUNJ AJMER ROAD BALUGANJ AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | ₹3.2 Cr+₹41.0 L (14.9%) | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹3.3 Cr+₹50.2 L (18.2%)Rejected-Finance | ₹3.3 Cr+₹50.2 L (18.2%) | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | L5₹3.8 Cr+₹1.1 Cr (39.4%)Rejected-Finance 140 BAJRANG NAGAR SIKANDRA AGRA | ₹3.8 Cr+₹1.1 Cr (39.4%) | L5 | Rejected-Finance Rejected due to higher Rates |
| Sl No | Description | Qty | Unit | M/S SHREE RAM CONSTRUCTION L3 | HARIBHAN SINGH CONTRACTOR L6 | M/S KAKA CONS L1 | SHREE RAM STONE SUPPLIERS PRIVATE LIMITED L4 | M/S Rakesh Kumar Contractor L5 | MUNNA LAL GUPTA CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3 | 5,000 | Sqm | 20 ₹1,00,000 | 5 ₹25,000 | 2 ₹10,000 Lowest | 2 ₹10,000 Lowest | 4.5 ₹22,500 | 5 ₹25,000 |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6). | 900 | Cum | 40 ₹36,000 | 75 ₹67,500 | 50 ₹45,000 | 30 ₹27,000 Lowest | 72 ₹64,800 | 50 ₹45,000 |
| 3.00 | Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. As per MoRT&H clause 401(b). | 2,040 | Cum | 2,600 ₹53,04,000 | 3,300 ₹67,32,000 | 1,850 ₹37,74,000 Lowest | 3,000 ₹61,20,000 | 3,200 ₹65,28,000 | 2,300 ₹46,92,000 |
| 4.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406. | 2,590 | Cum | 2,700 ₹69,93,000 | 3,580 ₹92,72,200 | 2,100 ₹54,39,000 Lowest | 3,300 ₹85,47,000 | 3,500 ₹90,65,000 | 2,300 ₹59,57,000 |
| 5.00 | Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work. | 20,350 | Sqm | 34 ₹6,91,900 | 42.2 ₹8,58,770 | 25 ₹5,08,750 | 9 ₹1,83,150 Lowest | 40 ₹8,14,000 | 18 ₹3,66,300 |
| 6.00 | Providing and laying Dense Graded Bituminous Macadam with higher capacity batch type HMP using crushed aggregates of specified grading-II premixed with bituminous binder @ 4.50% by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory & tandem rollers to achieve the desired compaction as per MORT&H specification clause 505 complete in all respects. | 1,010 | Cum | 9,000 ₹90,90,000 | 10,500 ₹1,06,05,000 | 8,400 ₹84,84,000 Lowest | 8,750 ₹88,37,500 | 10,250 ₹1,03,52,500 | 9,000 ₹90,90,000 |
| 7.00 | Providing and applying tack coat with bitumen VG-10 using Bitumen Pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | 20,350 | Sqm | 11 ₹2,23,850 | 11 ₹2,23,850 | 10 ₹2,03,500 | 8 ₹1,62,800 Lowest | 9 ₹1,83,150 | 10 ₹2,03,500 |
| 8.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects | 610 | Cum | 9,500 ₹57,95,000 Lowest | 11,890 ₹72,52,900 | 9,600 ₹58,56,000 | 9,700 ₹59,17,000 | 11,500 ₹70,15,000 | 9,500 ₹57,95,000 Lowest |
| 9.00 | Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. | 128 | Cum | 5,800 ₹7,42,400 | 7,800 ₹9,98,400 | 6,600 ₹8,44,800 | 6,400 ₹8,19,200 | 7,650 ₹9,79,200 | 5,600 ₹7,16,800 Lowest |
| 10.00 | Construction of embankment with approved materials
deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Open Area) | 12,500 | Cum | 70 ₹8,75,000 | 114 ₹14,25,000 | 80 ₹10,00,000 | 40 ₹5,00,000 Lowest | 110 ₹13,75,000 | 90 ₹11,25,000 |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
26 Feb 2026, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widening and strengthening work of Aahran Puliya to Shivalaya Mandir Tak
2026_CEAGR_1118243_1
605/14M-AC/2025-26 dated 30-01-2026
Open Tender
Civil Works
Item Wise
365 days
Agra
Widening and strengthening work
2 documents required · 2 mandatory
₹2,360
₹7.8 L
Agra
9 Apr 2026
19 Feb 2026
26 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
21 Feb 2026
Scarifying existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6).
Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. As per MoRT&H clause 401(b).
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.
Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work.
Providing and laying Dense Graded Bituminous Macadam with higher capacity batch type HMP using crushed aggregates of specified grading-II premixed with bituminous binder @ 4.50% by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory & tandem rollers to achieve the desired compaction as per MORT&H specification clause 505 complete in all respects.
Providing and applying tack coat with bitumen VG-10 using Bitumen Pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Construction of un-reinforced, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Open Area)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (CC Area)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) SOR No. 12.01 (i) SI No. 304 (B)
Providing and laying cement concrete in 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) SOR NO. 12.04 (2100)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per DSR 6.1.1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.)
Providing & Laying NP-3 600mm dia Hume pipe RCC concrete pipe for culvert on first class in single row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) SOR No. 9.04 (2900)
Providing & Laying NP-3 350mm dia Hume pipe RCC concrete pipe for culvert on first class in single row including fixing socket with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2900 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) SOR No. 9.04 (2900)
Pointing on brick work with cement mortar 1:3 (1Cement : 3 Coarse Sand) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) SOR No. 13.02 (1300 & 2200)
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) SOR NO. 12.08 (1500 & 1700 & 2100)
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) SOR No. 13.03 (1300 & 2200)
Part-B Maintainance Charge including @ All Items as per Direction of E/I for the period of Five Years from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 19)
Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 19)
Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 19)
Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 19)
Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 19)
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done.
stage.html
html • 0.05 MB
techsummary_2078465.pdf
BOQ Comparative Chart
xlsx
finsummary_2078465.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_2078465.xls
BOQ • 0.30 MB
SBDAddendumSHIVALAYMANDIR.pdf
Tender Documents • 2.29 MB
SBD_SHIVALAYMANDIR.pdf
Tender Documents • 2.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .