| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.9 L+₹36,874.91 (2.23%)Rejected-AOC ALAGAGOUNDANOOR CHAMRAJPET PO METTUR TK SALEM DT | METTUR DAM | SALEM | TAMIL NADU | L2 | Rejected-AOC L2 |
Tender Value
₹16.8 L
EMD Value
₹16,750
Closing Date
22 Dec 2023, 3:00 pmClosed
Block Development Officer (VP)
BDO Office, P.N.Palayam
Salem District - P.N.Palayam Block- Construction of 30000 Lit OHT Kundiyapattu H/O C.K.Hills Vadakku nadu Panchayat at Jal Jeevan Mission - 2023-2024 Work No.02
2023_RDTN_400750_9
Roc.No.4597/2023/T7
Open Tender
Civil Works - Water Works
Item Wise
120 days
BDO Office, P.N.Palayam
As per Tender Document
3 documents required · 3 mandatory
₹0
₹16,750
11 Nov 2024
16 Dec 2023
22 Dec 2023
16 Dec 2023
22 Dec 2023
16 Dec 2023
Amount
Construction of 30,000Lit OHT (12.00m Stage) Kundiyapattu H/O C.K.Hills vadakkunadu.
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B
Second Depth of 2m to 4m below GL
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Board officers.
Below 1.5m from GL
0m to 1.50m below G
0m to 4.50m above GL
4.50 m to 7.32 m above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64 m above GL
14.64 m to 18.30 m above GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers.
Below GL
From GL to 3.30m
From 5.30m to 6.30m above GL
From 8.30m to 9.30m above GL
From 11.30m to 12.30m
Square Column:
Square Column Below GL and upto 3.30m above GL
3.31m to 4.30m ht
4.31m to 5.30m ht
5.31m to 6.30m ht
6.31m to 7.30m ht
7.31m to 8.30m ht
8.31m to 9.30m ht
9.31m to 10.30m ht
10.31m to 11.30m ht
11.31m to 12.30m ht
Curved surface
'Supplying, cutting, bending, tying, fabricating and placing in position of steel rods for all RCC works including cost of steel and binding wire etc.( The steel should conform to the relevant ISspecification and supplied with test certificate Fe. 415 grade as per IS specification No.1786/1985 and as amended from time to time) delivery at site of work including loading, freight, unloading,
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers
Pipe connection arrangements for inlet,outlet,scour and overflow etc. including cost of pipes,specials,valve,labour charges for lifting, aligning, cutting, threading ,fixing and painting of GI pipes with two coats of approved quality enamal paint etc. complete as detailed below.
65mm GI pipes for inlet connection
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers
Labour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K Ezhilarasan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .