| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.6 LAccepted-AOC VPO DUMERKHA KALAN TEH NARWANA 126116 | DUMERKHA KALAN | JIND | HARYANA | 126116 | 1 | Accepted-AOC AOC | |
| 2 | 2₹13.5 L+₹90,870 (7.20%)Rejected-Finance PLOT 411 GALI NO 9 GANDHI NAGAR GANDHI NAGAR 122001 | GANDHI NAGAR | GURUGRAM | HARYANA | 122001 | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | The V.K. Co-Operative Labour & Construction Society Limited L1 | THE JIYA CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L2 |
|---|---|---|---|---|---|
| 2.00Reparing and Providing and Fixing of Existing Cooling Tower Parts at office building MCG Info City C1 Sector 34 under limit of minicipal Corporation Gurgaon | |||||
| 3.00 | Services Charges For Dismentaling and Fitting of 80TR Cooling Tower including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 1 | Job | 13,125 ₹13,125 Lowest | 13,400 ₹13,400 |
| 4.00 | Supply and Erection Alu. Fan Set Assy. 72` (4 Blade) Bore : 42MM in 200 TR Cooliong Tower including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 1 | Each | 20,475 ₹20,475 Lowest | 20,900 ₹20,900 |
| 5.00 | Supply and Erection Alu. Fan Set Assy. With Hub 1200MM (4 Blade)Bore Size : 38MM in 80 TR Cooling Tower including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 1 | Each | 13,000 ₹13,000 Lowest | 13,250 ₹13,250 |
| 6.00 | Supply and Erection of Existing 200TR Cooling Tower 10`x10` including PVC Fills, Nipple, Nozzle, Float Walve, GI Rod and Dismentaling and Fitting etc. including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 2 | Each | 1,45,000 ₹2,90,000 Lowest | 1,48,000 ₹2,96,000 |
| 7.00 | Supply and Erection of Balancing Valve 150 MM including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 2 | Each | 44,000 ₹88,000 Lowest | 45,000 ₹90,000 |
| 8.00 | Services Charges For Dismentaling of Balancing Valve 150 MM including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 2 | Each | 8,400 ₹16,800 Lowest | 8,500 ₹17,000 |
| 9.00 | Buy Back and dismantled of Old Balancing Valve 150 mm to complete the job in all respect. | 2 | Each | 2,000 ₹-4,000 Lowest | 2,000 ₹-4,000 Lowest |
| 10.00 | Supply and Erection of 3 HP 12th Stage Induction Motor including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 1 | Each | 29,610 ₹29,610 Lowest | 30,202 ₹30,202 |
| 11.00 | Supply and Erection of Oil Level Sensor required to complete the job in all respect. | 1 | Each | 31,000 ₹31,000 Lowest | 31,000 ₹31,000 Lowest |
Tender Value
₹12.6 L
EMD Value
₹25,257
Closing Date
13 Jan 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Reparing and Providing and Fixing of Existing Cooling Tower Parts at office building MCG Info City C1 Sector 34 under limit of minicipal Corporation Gurgaon.
2026_HRY_494938_1
2026215ACB11 2AD2 400E 82FA F844756C0F92285ULB
Open Tender
Civil Works
Works
20 days
Gurugram
Reparing and Providing and Fixing of Existing Cooling Tower Parts at office building MCG Info City C1 Sector 34 under limit of minicipal Corporation Gurgaon.
2 documents required · 2 mandatory
₹1,000
Yes
₹25,257
Yes
27 Jan 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
Reparing and Providing and Fixing of Existing Cooling Tower Parts at office building MCG Info City C1 Sector 34 under limit of minicipal Corporation Gurgaon
Services Charges For Dismentaling and Fitting of 80TR Cooling Tower including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection Alu. Fan Set Assy. 72` (4 Blade) Bore : 42MM in 200 TR Cooliong Tower including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection Alu. Fan Set Assy. With Hub 1200MM (4 Blade)Bore Size : 38MM in 80 TR Cooling Tower including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of Existing 200TR Cooling Tower 10`x10` including PVC Fills, Nipple, Nozzle, Float Walve, GI Rod and Dismentaling and Fitting etc. including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of Balancing Valve 150 MM including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Services Charges For Dismentaling of Balancing Valve 150 MM including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Buy Back and dismantled of Old Balancing Valve 150 mm to complete the job in all respect.
Supply and Erection of 3 HP 12th Stage Induction Motor including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
Supply and Erection of Oil Level Sensor required to complete the job in all respect.
Supply and Erection of Water Flow Switch Make Honeywell required to complete the job in all respect.
Supply and Erection of Water Temperature Sensor required to complete the job in all respect.
Supply and Erection of SCPM Card Make Carrier required to complete the job in all respect.
Supply and Erection of External Compressor oil Filter required to complete the job in all respect.
Supply and Erection of Internal Compressor oil Filter required to complete the job in all respect.
Supply and Erection of Synthetic screw compressor oil required to complete the job in all respect.
Overhauling, Lifting, Shifting and Transportation including (Bearing, Winding, Screw, Bearing Plate, O-ring, NRV) and Pressure Testing and Filling of GAS refrigerant R-134A of Compressor required to complete the job in all respect.
Supply and Erection of Current transformer 180A Circuit required to complete the job in all respect.
Supply and Erection of Contractor Siemens 3TF50, 3TF48, 3TF32 required to complete the job in all respect.
Buy back and dismantled chiller compressor accessories as replaced above complete in all respect. required to complete the job in all respect.
Supply and Erection of Star Contactor and Delta Contactor required to complete the job in all respect.
Supply and Erection of Oil Pump required to complete the job in all respect.
Condenser Descaling with Chemical required to complete the job in all respect.
Supply and Erection of HRC Fuse required to complete the job in all respect.
Supply and Erection of Display Card required to complete the job in all respect.
Supply and Erection Electric Motor 3HP / 960RPM, IE-2 Type, 3 Phase, Make : Sabar / Kissan / Oswal including all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_573400.xls
BOQ • 0.26 MB
AD0147538.pdf
Additional Documents • 0.98 MB
OT0147538.pdf
Other Document • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .