Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹3.8 L+₹15,050 (4.08%)Accepted-Finance VILLAGE KOTLU P O BAHINA TEHSIL BARSAR DISTRICT HAMIRPUR H P | BAHINA | HAMIRPUR | HIMACHAL PRADESH | L2 | Accepted-Finance Accept | |
| 3 | L3₹3.9 L+₹21,080 (5.71%)Accepted-Finance HIMACHAL PRADESH HP | L3 | Accepted-Finance Accept |
Tender Value
₹3.5 L
EMD Value
₹6,921
Closing Date
4 Jun 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer Jal Shakti Division Bhoranj
Repair and flushing of 13NOs various India Mark-II and Mark III Hand Pumps
2025_HPIPH_106309_1
1240-1300 dt 27-05-2025
Open Tender
Civil Works
Item Rate
30 days
Executive Engineer Jal Shakti Division Bhoranj
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
EE Bhoranj
₹6,921
8 Jul 2025
27 May 2025
5 Jun 2025
27 May 2025
4 Jun 2025
27 May 2025
Amount
Removal of socketted/flanged and screwed riser pipes including connection rods, plungers, valve assembly, charging intrite pump, buckets, rubber ceilling rings including all leads and lifts complete in all respect as per the direction of Engineer in charge.
Replacement of unserviceable cylinder etc. of India Mark - II cylinder complete in all respect including cost of cylinder washers and O- rings etc complete in all respect as per the direction of Engineer in charge..
Mark -II ( 32 mm dia)
Mark -III ( 65 mm dia)
Repair of serviceable cylinder etc of of India Mark - II and India mark - III bucket washer O - rings, checkwall washer etc complete in all respect as per the direction of Engineer in charge.
Re-fixing of serviceable flanged screwed and socketted riser pipes connecting rods and cylinder assembly in bore well complete including cost of threading seamless whereever required complete in all respect as per the direction of Engineer in charge.
Re-development of bore well and yield testing with Air compressor through V-notch and disinfection etc. complete in all respect as per IS- 2800-1979 and as per the direction of Engineer in charge.
Transporation of suitable jeep for carriage the part of hand pump alongwith necessary accessories required diring repair handpump to the site of work complete in all respect as per the direction of Engineer in charge.
Providing and fixing of riser pipe of following dia complete in all respect as per the direction of Engineer in charge.
Mark -II ( 32 mm dia)
Mark -III ( 65 mm dia)
Providing , supplying and fixing connecting rods 12 mm electro galvanized complete in all respect as per the direction of Engineer in charge.
Providing and fixing seamless sockets of following dia complete in all respect as per the direction of Engineer in charge.
Mark -II ( 32 mm dia)
Mark -III ( 65 mm dia)
Providing and fixing ball bearing 6204 complete in all respect as per the direction of Engineer in charge.
Providing and fixing body with liner complete in all respect as per the direction of Engineer in charge.
Transporation of compressor with assembly complete in all respect as per the direction of Engineer in charge.
Providing and fixing chain with coupling complete in all respect as per the direction of Engineer in charge.
Ms Rakesh kumar (BID ID -522043)
rohit kumar (BID ID -522052)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .