Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58,851.69Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹62,394.30+₹3,542.61 (6.02%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹69,327
EMD Value
₹2,080
Closing Date
11 Aug 2026, 6:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF DRAIN NEAR THE ORCHARD OF MOHAMMAD YOUSUF ZARGAR AT BALSOO KULGAM 399
2026_RDPR_318414_49
e- NIT No. 38 OF REWK/UT CAPEX/PRI/2026-27 Dated 29-07-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹2,080
17 Aug 2026
29 Jul 2026
13 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance by way of cutting down of trees, bushes ,removal of tree trunks etc incl. disp.of rubbish | 4 | no | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1 metres in all kinds of soil | 5.76 | cum | - | - |
| 3 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete. | 5.52 | cum | - | - |
| 4 | Providing & laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level(1:3:6 coarse sand 20 mm nominal size stone agg.) including carraige loading unloading Including headload. | 6.91 | cum | - | - |
| 5 | Centring and shuttering incld. Strutting, proping etc & removal of form work for Founadtions, footings, bases of columns for mass concrete. | 43.2 | Sqm | - | - |
| 6 | photograph /signboard charges(2.5X2.5)size | 1 | job | 0.6 | ₹0.6 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_1050270.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .