Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | ₹1.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 LRejected-AOC | ₹1.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | P PICHANDI L1 | NETHAJI L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 54 | CUM | 237.4 ₹12,819.60 | 273.78 ₹14,784.12 |
| 2.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 2.57 | CUM | 4,931.25 ₹12,673.31 | 5,479.17 ₹14,081.47 |
| 3.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum | 15.19 | SQM | 5,538.4 ₹84,128.30 | 6,153.78 ₹93,475.92 |
| 4.00 | Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 97.6 | SQM | 256.83 ₹25,066.61 | 285.37 ₹27,852.11 |
| 5.00 | Colour washing two coats using approved colour pigments including cost nveyance of all materials to site and all labour charges etc complete | 82.92 | SQM | 47.7 ₹3,955.28 | 53 ₹4,394.76 |
| 6.00 | GST 18% | 1 | No | 24,955.76 ₹24,955.76 | 27,825.91 ₹27,825.91 |
Tender Value
Refer Docs
EMD Value
₹1,851
Closing Date
6 Mar 2026, 3:00 pmClosed
The Block development officer, Arcot
The Block development office, Arcot
Construction of Composite pit at Kirambadi Panchayat
2026_RDTN_669450_1
A4/3447/2024
Open Tender
Civil Works
30 days
The Block development office, Arcot
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹1,851
12 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Colour washing two coats using approved colour pigments including cost nveyance of all materials to site and all labour charges etc complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_804410.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_804410.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid