| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC | ₹19.5 L | L1 | Accepted-AOC Qualified and Lowest amount quoted so accepeted |
| 2 | L2₹19.5 LRejected-AOC NO 2 1769 NORTH STREET THIRUKUVALAI NAGAPATTINAM | THIRUKUVALAI | NAGAPATTINAM | TAMIL NADU | 610204 | ₹19.5 L | L2 | Rejected-AOC highest amount quoted so Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Water Supply Works Experience Certificate not Produced |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Technical Assistant Details Not Produced |
| Sl No | Description | Qty | Unit | MGM CONTRACTOR L1 | M/S UMA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.0001. Construction of 30000 Ltr OHT at Puthur Panchayat. | |||||
| 2.00 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. Including leveling the sites complete complying with standard specifications and as directed. In sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. TNBP SS NO 20B 23 & 24 First depth of 2m From 0 to 2 m below GL | 58.55 | cum | 260 ₹15,223 | 263.7 ₹15,439.64 |
| 3.00 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation II nd Depth Second depth of 2m From 2m to 4 m below GL | 13.12 | cum | 263.7 ₹3,459.74 | 263.7 ₹3,459.74 |
| 4.00 | Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers | 5.83 | cum | 2,738 ₹15,962.54 | 2,738 ₹15,962.54 |
| 5.00 | Cement concrete 1:4:8 mix (one cement five sand and ten hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Completeas per specification and as direceted TNBP SS NO. 28 | 6.71 | cum | 6,685.6 ₹44,860.38 | 6,685.6 ₹44,860.38 |
| 6.00 | Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. Below 1.5m from GL | 13.52 | cum | 8,389 ₹1.1 L | 8,389 ₹1.1 L |
| 7.00 | 0m to 1.50m below GL | 1.75 | cum | 8,389 ₹14,680.75 | 8,389 ₹14,680.75 |
| 8.00 | 0m to 4.50m above GL | 2.83 | sqm | 8,530.1 ₹24,140.18 | 8,530.1 ₹24,140.18 |
| 9.00 | 4.50 m to 7.32 m above GL | 2.22 | sqm | 8,808 ₹19,553.76 | 8,808 ₹19,553.76 |
| 10.00 | 7.32 m to 10.98 m above GL | 2.53 | MT | 9,085 ₹22,985.05 | 9,085.8 ₹22,987.07 |
Tender Value
₹19.7 L
EMD Value
₹19,710
Closing Date
30 Dec 2025, 3:00 pmClosed
Block Development Officer(B.P)Thalainayar
Block Development Officer(B.P)Thalainayar
Construction Of New OHT in 30000 Litre Capacity in Puthur panchayat Thalainayar Block
2025_RDTN_635623_1
966/2024/A2
Open Tender
Civil Works
Thalainayar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,710
7 Jan 2026
23 Dec 2025
30 Dec 2025
23 Dec 2025
30 Dec 2025
23 Dec 2025
23 Dec 2025 - 30 Dec 2025
Amount
01. Construction of 30000 Ltr OHT at Puthur Panchayat.
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. Including leveling the sites complete complying with standard specifications and as directed. In sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. TNBP SS NO 20B 23 & 24 First depth of 2m From 0 to 2 m below GL
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation II nd Depth Second depth of 2m From 2m to 4 m below GL
Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers
Cement concrete 1:4:8 mix (one cement five sand and ten hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Completeas per specification and as direceted TNBP SS NO. 28
Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. Below 1.5m from GL
0m to 1.50m below GL
0m to 4.50m above GL
4.50 m to 7.32 m above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64 m above GL
14.64 m to 18.30 m above GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officer Below GL
From GL to 3.30m
From 5.30m to 6.30m above GL
From 8.30m to 9.30m above GL
From 11.30m to 12.30m
Square Column Below GL and upto 3.30m above GL
3.31m to 4.30m ht
4.31m to 5.30m ht
5.31m to 6.30m ht
6.31m to 7.30m ht
7.31m to 8.30m ht
8.31m to 9.30m ht
9.31m to 10.30m ht
10.31m to 11.30m ht
11.31m to 12.30m ht
Curved Surface - upto 3.30m ht.11.30m to 12.30m
Supplying, cutting, bending, tying, fabricating and placing in position of steel rods for all RCC works including cost of steel and binding wire etc.( The steel should conform to the relevant ISspecification and supplied with test certificate Fe. 415 grade as per IS specification No.1786/1985 and as amended from time to time) delivery at site of work including loading, freight, unloading, stacking, transit insurance charges, taxes etc. complete.and as directed by the TWAD Board officers.
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departmental officer) and as directed by the TWAD Board officers.
Providing Fusion Bonded Epoxy coting not lees then 175microns thickness and upto 300microns to reinforcement of all diameters as per IS 13620/1993 including testing of coating at plant.the cost is inclusive of cost on account of carefulhandling, PVC coated binding wires, tochup material supplied by coating agency, repair work, loading, unloaing and strengthening of bent rods etc., complete as per specification and as directed by the engineer in chrge.
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50mm x 6mm MS angle for both sides and for steps at 30cm C/C welded jointed etc ., for I staging from GL to 1st level brace (weight 4.5kg/m) IInd and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level- 1No. and above Ground Level - 4Nos. Supply and fixing of 32mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS Base plate of 100mm X 100mm X 6mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers.
Providing and fixing of RCC inner access ladder in RCC 1:11/2 :3 (one cement,one and half sand and three aggregate) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centring,shuttering charges, mixing concrete,curing etc. to required height and clear width of 45 cm consisting of 2 nos. of vertical post of 10 cm x 15 cm and step slab of 25mm x 25mm etc.complete and as directed by TWAD Board Officers.
Providing 110mm PVC vent cowl arrangements mosquito proof nylon net and as directed by TWAD Board officers
Supply and fixing of cut stone of size 0.60m x 0.60m x 0.10m in CM 1;3(one cement and three sand) below inlet pipe for Service Reservoir as directed by TWAD Board Officers.
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by TWAD Board officers
Pipe connection arrangements for inlet,outlet,scour and overflow etc. including cost of pipes,specials,valve,labour charges for lifting, aligning, cutting, threading ,fixing and painting of GI pipes with two coats of approved quality enamal paint etc. complete as detailed below.65mm GI pipes for inlet connection
50mm GI pipes for scour pipe
90mm PVC Threaded coupler
63mm PVC Threaded coupler
65mm dia GI Tee
65mm dia GI bend 90
65mm dia GI bend (short)
65mm GI coupler
65mm GI union
65mm GI Elbow
50mm GI union
50mm GI Elbow
65mm GI Tee
65x50mm GI reducer
75mmx63mm PVC reducer
65mm GM gate valve
50mm GM gate valve
63 mm PVC 4Ksc Pipe
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers
abour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling.
Sub Estimate Pipe line Supply and delivery of PVC rigid pipes for potable water supply with ISI 4985 / 2000 marking with necessary couplers (or) bell ended pipes as specified in ISI, the required quantity of solvent cement and having the following working pressure. The cost of pipes should include loading, freight, transit insurance, incidental charges, packing, taxes and transportation charges upto stack yard in good condition etc., complete (the cost excluding unloading from lorries at stack yard and stacking which will be paid separately) and as directed by the Depatmental Officers.
Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste as per standard specifications and as directed by the Departmental Officers.
Refilling with excavated earth (other than sand) in respect of following sizes of pipes watered well rammed and consolidated etc. complete complying with standard specification for filling the trenches after the pipes and specials are laid, jointed and tested and as directed by the Depatmental Officers
Labour charges for Cutting and Threading of GI pipes (Sch of rate 2024 - 25, Page No.34, Unique code:W-0133)
PVC Elbow 90mm
PVC Tee 90mm
GM Gate Valve 50mm
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity
M/S UMA CONSTRUCTIONS (BID ID -1549848)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_760709.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid