| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC AT UPPER BOOTY NEAR KRISHNA NURSING HOME P S SADAR RANCHI JHARKHAND 835217 | RANCHI | JHARKHAND | 835217 | ₹24.7 L | L1 | Accepted-AOC Found L-1 quoted bidder |
| 2 | L2₹24.9 LRejected-Finance FLAT NO 2B SWARANA PALACE GAMHARIYA SERAIKELA KHARSAWAN 832108 JHARKHAND | GAMHARIYA | SERAIKELA KHARSAWAN | JHARKHAND | 832108 | ₹24.9 L | L2 | Rejected-Finance Quoted rate is higher than estimated cost. |
| 3 | L3₹25.1 LRejected-Finance AMETHIA NAGAR NAMKUM RANCHI | RANCHI | JHARKHAND | 829205 | ₹25.1 L | L3 | Rejected-Finance Quoted rate is higher than estimated cost. |
Tender Value
₹24.7 L
EMD Value
₹49,400
Closing Date
7 Apr 2026, 3:00 pmClosed
DGM, TC, JSR
DGM, TC, JSR Office, Grid Campus, DVC More, Near Sudha Diary, JSR
Annual maintenance work of 220 KV Chandil STPS, 220 KV Chandil PGCIL and 132 KV Chandil Manikui transmission line for the period from 01.04.2026 to 31.03.2027
2026_JSEB_111994_1
891/PR/JUSNL/2025-26
Open Tender
Electrical Works
365 days
Chandil
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹49,400
Yes
15 Apr 2026
24 Mar 2026
8 Apr 2026
24 Mar 2026
7 Apr 2026
24 Mar 2026
Routine Monthly Patrolling of 220 KV Transmission Lines (56 Km/Month) including tree prunning, repositioning of earth wire, checking, tightening & positioning of fasteners, all Jumpers etc and back filling of Earth errosion of tower legs along the corridor and vehicle with fuel & driver required for the work. (i) 220 KV Chandil-STPS S/C Transmission line from Loc. No. 336 to 254 (12 month x 28 Km/month=336 Km for 12 month) (ii) 220 KV Chandil-PGCIL D/C Transmission line from Loc. No. 332 to 92 (12 month x 80 Km/month=960 Km for 12 month) (iii) 132 KV Chandil-Manikui S/C Transmission line from Loc. No. 1 to 3 (12 month x 0.5 Km/month=6 Km for 12 month) i.e. Total for 365 days/ 1 year = (336+960+6) Km = 1302 Km.
Break-Down and Scheduled Maintenance of Transmission lines.
(i) up to 25 jumper
(ii) beyond 25 jumper to 50 jumper
(iii) beyond 50 jumper
(i)Upto First 50kM
(ii)50kM<Distance<500kM
Measurement of Earth Footing Resistance of Transmission Line Towers in presence of AEE/JEE as per the direction issued.
Sub-Total
Contractors Profit on Sl. No. 1
Overhead Expendinture for T&P etc on Sl. No. 1
Total
Total + GST
Labour Cess @1% on (Total + GST)
Grand Total
Say Rs.
stage.html
html • 0.04 MB
techsummary_151214.pdf
finsummary_151214.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
CHD_PricePart.xls
Additional Documents • 0.04 MB
CHDTenderDocuments891.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid