| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | ₹4.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 LAdmitted-Finance | ₹4.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI GAYATRI CONSTRUCTIONS L2 | Vinay Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | 1)Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-charge.
With cement mortar 1:4 (1 cement : 4 fine sand). | 30 | Sqm | 550 ₹16,500 Lowest | 600 ₹18,000 |
| 2.00 | 2)Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 28 | Cum | 3,800 ₹1,06,400 Lowest | 4,500 ₹1,26,000 |
| 3.00 | 3)Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. | 15 | Sqm | 600 ₹9,000 Lowest | 1,200 ₹18,000 |
| 4.00 | 4)Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. | 900 | Kg | 5 ₹4,500 Lowest | 9 ₹8,100 |
| 5.00 | 5)Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar | 6 | Cum | 1,900 ₹11,400 Lowest | 2,500 ₹15,000 |
| 6.00 | 6)Disposal of cement concerete debries to dumping ground (lead about 15km) by mechanical transport, including bringing the materials to ground floor from terrace loading and unloading complete. (Net quantity with out voids will be measured for payment) | 54 | Cum | 1,500 ₹81,000 | 1,250 ₹67,500 Lowest |
| 7.00 | 7) Dismembering of roof top structural steel standard tubular/ angular Roof top tower of 12 m height with angular bracings and vertical and horizontal cable gantry and ladder with safety rings, antenna mounts etc., of steelwork in built up sections in angles, tees, flats, channels and pipes including all gusset plates, bolts, nuts, cutting rivets, welding etc. and also the cables/pvc pipes fixed to the gantry, including dismembering, lifting and stacking on terrace floor etc., complete as per the directions of Engineer-in-charge.
(NOTE:- The rate includes cost of all operations involved in dismantling, dismembering the tower and connected cable gantry upto the BTS room/ shelter, ladder, etc., and stacking on terrace and making arrangements for weighing of tower steel materials and submission of weighing bill, including hire charges and labour charges of tools, plants and machineries, transport to weighing machine and insurance, safety provisions, etc., all complete). | 3 | Job | 68,000 ₹2,04,000 | 59,000 ₹1,77,000 Lowest |
| 8.008) Charges for Mechanical Transportation of 12m high 3 Legged Roof top Tower members, gantry members, ladder with safety rings etc., comprising of MS Tubes, angles, flats, channels, pipes, nuts, and bolts etc., of varying sizes and lengths from site of work to TE building as mentioned, or/ any other specified place in Hyderabad. The entire lot of Tower materials including horizontal & vertical gantry (approximatley 3.00 tonnes) shall be transported in a single lot. The job includes cost of transporting of dismantled tower, gantry, ladder materials including loading, unloading, transporting and handing over at stores at the designated location in Hyderabad etc., complete as per the directions of Engineer-in-charge. | |||||
| 8.10 | 8.1) From site of work at PALAMAKULA to TE building at SHAMSHABAD, which is within approximately 15 Km lead from the place of work | 1 | Job | 18,000 ₹18,000 Lowest | 20,000 ₹20,000 |
| 8.20 | 8.2) From site of work at NATRAJ NAGAR, near to Tappachabutra to TE building at GOWLIGUDA, which is within approximately 5 Km lead from the place of work | 1 | Job | 18,000 ₹18,000 Lowest | 19,000 ₹19,000 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
12 May 2026, 6:00 pmClosed
EE(C), BSNL Civil Division-II, Hyderabad
Executive Engineer (C), BSNL Civil Division-II, Room No. 302, III floor, BSNL Bhawan, Adarsh Nagar, Hyderabad - 500063
Dismembering of existing 12m high Tubular_Angular Rooftop Tower with H _ V Gantry incl. dismantling RCC Beams and Column foundations etc., on terrace of NBSNL Sites at 1. at PALAMAKULA RR-2036 near Shamshabad, 2. NATRAJ NAGAR and 3. SINGARENY COLONY
2026_BSNL_276456_1
NIT No. 09/NIT/CECTSCZ/HYD/2026
Open Tender
Civil Works
Item Rate
30 days
Palamkula, Natraj Nagar and Singareny Colony
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Accounts Officer (Cash), O/o PGMT, HTD, Hyderabad
₹10,000
14 May 2026
4 May 2026
14 May 2026
4 May 2026
12 May 2026
4 May 2026
4 May 2026 - 12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1)Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-charge.
With cement mortar 1:4 (1 cement : 4 fine sand). | 30 | Sqm | 547.4 | ₹16,422 |
| 2 | 2)Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 28 | Cum | 3,551.25 | ₹99,435 |
| 3 | 3)Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. | 15 | Sqm | 1,147.2 | ₹17,208 |
| 4 | 4)Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. | 900 | Kg | 9.05 | ₹8,145 |
| 5 | 5)Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar | 6 | Cum | 2,060.2 | ₹12,361.2 |
| 6 | 6)Disposal of cement concerete debries to dumping ground (lead about 15km) by mechanical transport, including bringing the materials to ground floor from terrace loading and unloading complete. (Net quantity with out voids will be measured for payment) | 54 | Cum | 1,405.17 | ₹75,879.18 |
| 7 | 7) Dismembering of roof top structural steel standard tubular/ angular Roof top tower of 12 m height with angular bracings and vertical and horizontal cable gantry and ladder with safety rings, antenna mounts etc., of steelwork in built up sections in angles, tees, flats, channels and pipes including all gusset plates, bolts, nuts, cutting rivets, welding etc. and also the cables/pvc pipes fixed to the gantry, including dismembering, lifting and stacking on terrace floor etc., complete as per the directions of Engineer-in-charge.
(NOTE:- The rate includes cost of all operations involved in dismantling, dismembering the tower and connected cable gantry upto the BTS room/ shelter, ladder, etc., and stacking on terrace and making arrangements for weighing of tower steel materials and submission of weighing bill, including hire charges and labour charges of tools, plants and machineries, transport to weighing machine and insurance, safety provisions, etc., all complete). | 3 | Job | 64,777.79 | ₹1,94,333.37 |
| 88) Charges for Mechanical Transportation of 12m high 3 Legged Roof top Tower members, gantry members, ladder with safety rings etc., comprising of MS Tubes, angles, flats, channels, pipes, nuts, and bolts etc., of varying sizes and lengths from site of work to TE building as mentioned, or/ any other specified place in Hyderabad. The entire lot of Tower materials including horizontal & vertical gantry (approximatley 3.00 tonnes) shall be transported in a single lot. The job includes cost of transporting of dismantled tower, gantry, ladder materials including loading, unloading, transporting and handing over at stores at the designated location in Hyderabad etc., complete as per the directions of Engineer-in-charge. | |||||
| 8.1 | 8.1) From site of work at PALAMAKULA to TE building at SHAMSHABAD, which is within approximately 15 Km lead from the place of work | 1 | Job | 22,575.74 | ₹22,575.74 |
| 8.2 | 8.2) From site of work at NATRAJ NAGAR, near to Tappachabutra to TE building at GOWLIGUDA, which is within approximately 5 Km lead from the place of work | 1 | Job | 19,927.56 | ₹19,927.56 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
BOQ_322920.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].