Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 LAccepted-AOC | ₹9.0 L | 1 | Accepted-AOC 1 |
| 2 | 2₹9.1 LRejected-AOC | ₹9.1 L | 2 | Rejected-AOC 2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-not admitted |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-not admitted |
| Sl No | Description | Qty | Unit | LAKSHMI ROADS AND INFRA L2 | MVT Gopal L1 |
|---|---|---|---|---|---|
| 1.00Construction of Threshing Floor ( 15M X 15M) @ Belathakottai H/o Thumbalahalli | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 59.07 | Cum | 246.52 ₹14,561.94 | 246.52 ₹14,561.94 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 36.95 | Cum | 5,027.91 ₹1.9 L | 5,027.91 ₹1.9 L |
| 4.00 | Supply and erecting Centering shuttering including supports for plane and side surfaces including cost and conveyance and all labour charges etc. Complete | 172.13 | Sqm | 525 ₹90,368.25 | 525 ₹90,368.25 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 43.24 | Cum | 5,762.1 ₹2.5 L | 5,762.1 ₹2.5 L |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 25.82 | Cum | 6,515.09 ₹1.7 L | 6,515.09 ₹1.7 L |
| 7.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete | 1.43 | Cum | 5,915.11 ₹8,458.61 | 5,915.11 ₹8,458.61 |
| 8.00 | Plastering in CM 1:5 12mm Thick using quality sand including conveyance of all materials to side and all labour charges for mixing, laying and curing etc complete | 15.31 | Sqm | 267.37 ₹4,093.43 | 267.37 ₹4,093.43 |
| 9.00 | Supply and Fixing of GI Pipes For Resting Shed (50mm GI Pipes) | 29.24 | Cum | 1,200 ₹35,088 | 516 ₹15,087.84 |
| 10.00 | Roofing with galvanised iron corrugated sheet of thickness 0.8mm including cost of " J " bolts and bitumen washer etc.complete | 19.89 | Cum | 990 ₹19,691.10 | 990 ₹19,691.10 |
Tender Value
₹9.2 L
EMD Value
₹10,000
Closing Date
22 Apr 2025, 3:00 pmClosed
The Block Development Officer (vP), Karimangalam
The Block Development Officer (vP), Karimangalam
Can be seen in the tender documents
2025_RDTN_545076_1
Roc.No.3391-2024-E1 dt07.04.2025 krm37
Open Tender
Civil Works
120 days
The Block Development Office Karimangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
30 Dec 2025
12 Apr 2025
22 Apr 2025
12 Apr 2025
22 Apr 2025
12 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid