| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹28.0 LAccepted-Finance | L-1 | Accepted-Finance Accept | |
| 2 | L-2₹28.3 L+₹27,589 (0.98%)Rejected-Finance | L-2 | Rejected-Finance Reject | |
| 3 | Rejected-Technical VILLAGE DHURENKA P O GHARER TEHSIL BHARMOUR DISTRICT CHAMBA H P | CHAMBA | HIMACHAL PRADESH | 176207 | - | Rejected-Technical Reject | |
| 4 | Rejected-Technical | - | Rejected-Technical Reject |
Tender Value
₹16.5 L
EMD Value
₹32,500
Closing Date
4 Mar 2022, 5:00 pmClosed
Executive Engineer
Division HPPWD Bharwain
CO link road Harijan Basti Baruha km 000 to 1500 SH CO Jeepable road formation cutting CD GSB WMM and Tarring between km 000 to 0750 under SCCP
2022_PWD_57195_1
C/o L/R Road to Baruha Under Bharwain Job 4
Open Tender
Civil Works
Item Rate
180 days
Bharwain
As per tender documents
4 documents required · 4 mandatory
₹500
₹32,500
5 Jul 2022
25 Feb 2022
5 Mar 2022
25 Feb 2022
4 Mar 2022
26 Feb 2022
Amount
Excavation in hilly area in all heights and depths and in all kind of soil by mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/ wedging out of rock ( where blasting is prohibited) and their intermediate classification of soil setting out true to the required line, grades width cutting and trimming of side slopes and level as shown on the drawing and as directed by the Engineer-in- Charge at site according to the M.O.R.D 2014 technical specification clause 302, 1600.02. Any loss to the public / private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per direction of the Engineer-in-charge including carriage of materials within all leads and lifts The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Construction of embankment with approved materials deposited at site from roadway cutting and excvation of other road structures or other sources in layers of suitable thickness not exceeding 200mm ( two hundred millimetres) spreading to required slope and compacted with three wheel 80-100 KN static/ vibratory road roller to meet the requirements of table 300.1 and 300.2 of MORD specifications to lines, grades, level and cross sections as per drawings or directions of the Engineer-in-charge including preparation of foundation for embankment in all kinds and classification of soils including saturated soil and dewatering/ bailing out of water wherever required including hauling of materials for construction of embankment within all leads and lifts. The rate shall include carriage of machineries, equipment, tools and materials and safety measures, payment of all taxes and other incidentals necessary to complete the work in all respects. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock, chiselling/wedging out rocks( where blasting in prohibited ) as per drawings and M.O.R.D. technical specification clause 305.1 and as per direction of the Engineer-in-charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty milimetres) compacted thickness including shoring and strutting and pumping and bailing out water ( surface and sub soil water ) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering and directions of Engineer-in-Charge, including carriage of materials within all leads , lifts and other incidental . The rates are inclusive of octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying concrete for plain/reinforced cement concrete 1:4:8 (one cement: four sand: eight graded crushed stone aggregate 25mm (twenty five millimetres) nominal size in open foundations complete as per drawing and technical specifications clause 802, 803, 804, 1202 and 1203 as per the direction of the Engineer-in-charge , including carriage of materials within all leads and lifts and other incidentals. The rate includes octroi, royalty, Malkana, toll tax , goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying filter media with granular crushed aggregate as per specification to a thickness or not less than 600mm ( six hundred millimeters ) with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing walls, return walls and retaining/ breast walls to the full height compacted to firm condition complete as per drawing and M.O.R.D. technical specifications clause 1204.3.8 and as per direction of Engineer- in- charge including carriage of materials within all leads and lifts and other incidental. The rate including octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing weepholes in brick masonry/ stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimetres) dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) (one vertical : twenty horizental) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 as per direction of Engineer-in-charge including carriage of materials with in all leads and lifts including other incidentals. The rate including octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government. .
Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundation for all type of structure complete of plain cement concrete grade M-10 (M-Ten) on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and M.O.R.D. technical specification Clause 802, 803, 1202 and 1203 as per the direction of the Engineer-in-charge , including carriage of materials within all leads and lifts and other incidentals. The rate includes octroi, royalty, Malkana, toll tax , sale tax or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation of culvert complete of plain/ reinforced concrete grade M-20 ( M twenty ) design mix cement contents not less than 360 kg per cubic metre on ground or under water including curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying under water complete for all heights/ depths including the cost of form work in abutments, piers and return walls etcetera as per drawings and technical specification clause 802, 803, 1202 ans 1203 and as per direction of Engineer-in-charge, including carriage of material within all leads and lifts and other incidential . The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain/reinforced cement concrete 1: 2:4 (one cement: two sand: four graded crushed stone aaggregate) in sub structure for all type of structure complete of plain cement concrete grade M-20 (M-twenty) nominal mix cement contents not less than 320 kg (three hundred twenty kilogram) per cubic metre on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and M.O.R.D. technical specification Clause 802, 804, 805, 806, 807,1202 and 1206 as per the direction of the Engineer-in-charge , including carriage of materials within all leads and lifts and other incidentals. The rate includes of octroi, royalty, Malkana, toll tax , goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated reinforced cement concrete in open foundation as per drawing and M.O.R.D. technical specification Clause 802, 803, 1202 & 1203 designed to obtain the minimum strength of grade M-25 (M twenty five) design mix cement contents not less than 340 kg (three hundred forty kilogram) per cubic metre and curing complete including cost of form work but excluding the cost of reinforcement for reinforced concrete work in superstructure as per the entire satisfaction and direction of Engineer-in-charge including carriage of materials within all leads and lifts and other incidental. The rate including octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying ( to level or slope) 600mm dia (six hundred millimetre ) diametre reinforced cement concrete heavy duty non pressure pipes IS Class NP-2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 : 2 ( One cement : two sand) but excluding the cost of excavation, protection works, back filling, concrete and masonry work in head walls and parapets as per drawing and technical specifications clause 1106 and as per direction of Engineer – in- Charge including carriage of materials within all leads and lifts and other incidentals . The rate includes octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 including cutting, bending, binding and placing in position complete in all respect including cost of binding wire upto all heights including carriage of materials within all leads and lifts and other incidentals . The rate includes octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawings and technical specifications Clauses 1001, 1004 and 1206 including cutting, bending, binding and placing in position complete in all respect including cost of binding wire upto all heights including carriage of materials within all leads and lifts and other incidentals . The rate includes octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Preparation of sub grade by dressing to camber (Earth work for the cutting involved for sub grade to be paid for separately)depending upon the classification of soil complete as per HPPWD specification including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer – in- Charge including other incidential . The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Consolidation of sub grade with road roller including makng good the undulation etcetra with earth or quarry soil etcetra and rerolling the sub-grade complete as per HPPWD specifications including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer – in- Charge including other incidential . The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Construction of gravel/soil aggregate sub base/base by providing well graded material of nominal maximum size grading 8-80mm (eighty millimetre) as per table 2.3 of IRC SP 77-2008, spreading in uniforms layers with tractor mount appropriate grading arrangements on prepared surface, mixing by mix in place method at OMC with tractor mount appropriate rotavator attachement and compaction with three wheel 80-100 KN static roller capacity to achieve the desired complete as per specifications contained in para 2.2, 3.6 and 3.7 of IRC SP-77-2008 and as per the direction of Engineer-in -Charge including carriage of material within all leads, lifts and other incidentals .The rate includes octroi, royality, Malkana, toll tax , goods service tax, labour cess or other taxes imposed by the Government.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 and 400.12 and Technical Specification Clause 406 in single layer and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and applying primer coat with Bitumen emulsion (SS-1) on the prepared surface of granular base including cleaning of road surface spraying primer @ 0.70 kg to 1.00 kg (zero point seventy kilogram to one kilogram) per square meter using mechanical means as per M.O.R.D. technical specifications clause No. 502 including carriage of materials within all leads and lifts and other incidentals . The rate includes octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 kg to 0.30 kg (zero point twenty five kilogram to zero point thirty kilogram) per square meter on the prepared granular surface treated with primer and cleaned with Hydraulic broom as per M.O.R.D. technical specifications clause No. 503 including carriage of materials within all leads and lifts and other incidentals . The rate includes octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing laying and rolling of open graded premix carpet of 20mm ( twenty millimeter) compacted thickness composed of 13.2mm ( thirteen point two millimeter) to 5.6mm ( five decimal six millimeter) aggregate at the rate of 0.27 cum (zero point two seven cubic meter)mixed with penetration VISCOSITY GRADE-30 (THIRTY) PAVING BITUMEN at the rate of 14.6 kg.(fourteen point six kilogramme) per 10 sqm.(ten square meter) of road surface to required line, grade and level to serve as wearing course on a previously prepared base, including mixing and heating binder and aggregate in suitable plant, laying with paver finisher and rolling with a three Wheel 80-100 KN static road roller capacity finished to required level and grade to be followed by seal coat of type-B as per M.O.R.D. technical specifications clause No. 508 by mechanical means including carriage of materials within all leads and lifts and other incidentals . The rate includes octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying seal coat for sealing the voids in a bituminous surface laid to specified level grade and cross fall using type-B as per technical specification clause 510 using VISCOSITY GRADE-30 (THIRTY) PAVING BITUMEN at the rate of 6.8 kg ( six point eight kilogram) premixed with 0.06 ( zero point zero six) cubic metre of fine aggregate per 10 Sqm. ( Ten square metre) mixing and heating in mini hot mix plant and laying by mechanical means of mixed material and rolling with power road roller 80-100 KN ( eighty to one hundred KN) as per the direction of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate includes octroi, royalty, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Mehar Chand
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .