| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.4 CrAccepted-AOC | ₹6.4 Cr | L-1 | Accepted-AOC The work is awarded to portal declared qualifying L-1 bidder S. K. Constructions. |
| 2 | L-2₹6.8 Cr+₹36.3 L (5.65%)Rejected-Finance | ₹6.8 Cr+₹36.3 L (5.65%) | L-2 | Rejected-Finance Not being L-1 bidder |
| 3 | L-3₹6.8 Cr+₹41.9 L (6.52%)Rejected-Finance | ₹6.8 Cr+₹41.9 L (6.52%) | L-3 | Rejected-Finance Not being L-1 bidder |
| 4 | L-4₹7.1 Cr+₹69.9 L (10.9%)Rejected-Finance | ₹7.1 Cr+₹69.9 L (10.9%) | L-4 | Rejected-Finance Not being L-1 bidder |
| 5 | Rejected-Technical SHIVNANDAN ROYAL PLOT NO 41 HOUSE NO 101 BHAMDI NAGPUR 440022 | NAGPUR | NAGPUR | MAHARASHTRA | 440022 | - | - | Rejected-Technical Cover-I Bid has been rejected after evaluation by Tender Committee as non-eligible and not acceptable in line with NIT terms and conditions and hence, Cover-II containing Price Bid will not be opened. |
Tender Value
₹7.9 Cr
EMD Value
₹9.9 L
Closing Date
27 Jul 2024, 5:00 pmClosed
GM(Civil)/HoD, WCL HQ
Office of GM(Civil), Coal Estate, Civil Lines, Nagpur-440001
Bituminous Carpeting of the road from Weigh Bridge No-1 to Bhagwanpur P.W.D road junction at Gokul OCM Murpar Sub Area of Umrer Area
2024_WCL_311721_1
wcl-hq-gmciv-e02-2024-25
Open Tender
Civil Works - Roads
Item Rate
2005 days
Umrer Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹9.9 L
11 Nov 2024
4 Jul 2024
29 Jul 2024
5 Jul 2024
27 Jul 2024
5 Jul 2024
5 Jul 2024 - 20 Jul 2024
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in?Charge: All kinds of soil
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means. Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications.
Providing and laying dense bituminous macadam using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 505 of specification complete in all respects. a) Using Batch Mix Plnt of appropriate capacity and Paver finisher Hydraustatic with Sensor. (i) for Grading I(40 mm nominal size )
Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 507 of specification a) Using Batch Mix Plant of appropriate capacity and Paver Finisher Hydraustatic with Sensor control. (iv) for Grading-II (30-45 mm thickness ) with 60/70 bitumen(VG-30)
Providing and applying tack coat with catonic bitumen emulsion (RS-1) using emulsion pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom and as per relevant clauses of section-503 of specifications. (i) @ 0.25 kg per sqm (normal bituminous surfaces)
Providing and Laying hot applied thermoplastic road marking strip on Bituminous Surface of specified shade/ colour of 2.5 mm thick including 1.5 Refractive index reflectorizing glass beads @ 250gm/sqm .Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35:2015. Initial Dry reflectivity RL shall be > 250 mcd/sqm/lux measured in the initial 7 days and sustained reflectivity RL of 100 mcd/sqm/ lux and Qd of 100 mcd/sqm/ lux measured at the end of 2 years by means of a Standard Reflectometer of Zehntner, Easylux, Delta make capable of measuring RL & QD both according to IRC 35:2015 clause 15.5. The finished surface to be level, uniform, and free from streaks and holes complete as per direction of Engineer-in-charge and in accordance with applicable specifications.(Refer MORTH Clause 803 for technical Specification and Performance for IRC 35:2015).
Supplying hard murum/ kankar at the road site, including conveying and stacking complete.
Carriage of OB at the road site, including conveying and stacking complete with 3 km (Average lead) and excluding Royalty, since work has to be taken up within the mine lease boundary (OB shall be provided by Department free of cost)
Carriage of OB at the road site, including conveying and stacking complete with 3 km (Average lead) and including Royalty, since work has to be taken up beyond the mine lease boundary (OB shall be provided by Department free of cost)
Spreading hard murum/OB/ gravel or kankar for side width complete
Compacting the hard murum/OB for side width including laying in layers on each side with vibratory roller including artificial watering etc. complete.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Supply and filling in plinth with stone dust under foundation,including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement .1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Total impact of GST for the purpose of CTC
SHRI JAI GIRNARI-PHM JV
M/s P.N. Dewalkar Construction
Supreme Startech Pvt Ltd.
SHRI JAI GIRNARI-PHM JV
M/s P.N. Dewalkar Construction
Supreme Startech Pvt Ltd.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .