| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC JHANSI | JHANSI | UTTAR PRADESH | 284001 | ₹4.1 Cr | L1 | Accepted-AOC Financial bid accepted |
| 2 | L2₹4.4 CrRejected-Finance | ₹4.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹4.7 CrRejected-Finance JHANSI | JHANSI | UTTAR PRADESH | 284001 | ₹4.7 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹4.9 CrRejected-Finance THANEI UP | BAREILLY | UTTAR PRADESH | 243001 | ₹4.9 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹5.2 CrRejected-Finance AIGAVAN UPARHAR DHARM RAJ MISHRA AIGAVAN UPARHAR MAHILA UPARHAR KARARI KAUSHAMBI UTTAR PRADESH 212216 UDYAM UP 46 0007784 | KAUSHAMBI | UTTAR PRADESH | 212216 | ₹5.2 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Anuj Tiwari L1 | M/S SHIV CONSTRUCTION COMPANY L5 | M/S ATUL GRAM VIKAS SANSTHAN L3 | APRAJIT CONSTRUCTION L4 | M/S HARI RAM SAHU L2 | M/S ARCHANA CONSTRUCTION L7 | M/s Hari Construction L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 3,174.8 | Cum | 2 ₹6,349.60 | 40 ₹1.3 L | 10 ₹31,748 | 50 ₹1.6 L | 50 ₹1.6 L | 50 ₹1.6 L | 30 ₹95,244 |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirment of table 300-2. As per Ref. to MoRTH Spec no-301+305. | 12,827.7 | Cum | 2 ₹25,655.40 | 40 ₹5.1 L | 25 ₹3.2 L | 50 ₹6.4 L | 50 ₹6.4 L | 100 ₹12.8 L | 20 ₹2.6 L |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 3,174.8 | Cum | 2 ₹6,349.60 | 50 ₹1.6 L | 15 ₹47,622 | 50 ₹1.6 L | 70 ₹2.2 L | 60 ₹1.9 L | 50 ₹1.6 L |
| 4.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. | 5,762.55 | Cum | 1,199 ₹69.1 L | 1,440 ₹83.0 L | 1,300 ₹74.9 L | 1,600 ₹92.2 L | 1,350 ₹77.8 L | 1,500 ₹86.4 L | 1,480 ₹85.3 L |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 5,249.16 | Cum | 1,269 ₹66.6 L | 1,520 ₹79.8 L | 1,389 ₹72.9 L | 1,600 ₹84.0 L | 1,400 ₹73.5 L | 1,750 ₹91.9 L | 1,600 ₹84.0 L |
| 6.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 28,200 | Sqm | 5 ₹1.4 L | 30 ₹8.5 L | 10 ₹2.8 L | 35 ₹9.9 L | 27.5 ₹7.8 L | 30 ₹8.5 L | 40 ₹11.3 L |
| 7.00 | Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 28,200 | Sqm | 7 ₹2.0 L | 11 ₹3.1 L | 10 ₹2.8 L | 10 ₹2.8 L | 9.6 ₹2.7 L | 10 ₹2.8 L | 11 ₹3.1 L |
| 8.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 Percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (DGBM-Gr-I) | 3,076.5 | Cum | 6,149 ₹1.9 Cr | 7,000 ₹2.2 Cr | 6,597 ₹2.0 Cr | 6,500 ₹2.0 Cr | 5,300 ₹1.6 Cr | 7,500 ₹2.3 Cr | 6,500 ₹2.0 Cr |
| 9.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507. | 846 | Cum | 7,649 ₹64.7 L | 8,000 ₹67.7 L | 8,200 ₹69.4 L | 7,000 ₹59.2 L | 7,300 ₹61.8 L | 8,500 ₹71.9 L | 8,800 ₹74.4 L |
| 10.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 8,186.06 | Cum | 19 ₹1.6 L | 105 ₹8.6 L | 39 ₹3.2 L | 60 ₹4.9 L | 90 ₹7.4 L | 100 ₹8.2 L | 100 ₹8.2 L |
Tender Value
Refer Docs
EMD Value
₹13.2 L
Closing Date
15 Dec 2025, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Widening and strengthening work from Km 1 to 6 (200) of Badwar Todi Fatehpur Road (ODR) in Jhansi district
2025_CEJNS_1097405_1
9206/ 44 C- Jhansi Circle/2025 Date 20.11.2025
Open Tender
Civil Works - Roads
365 days
Jhansi
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,250
₹13.2 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
16 Feb 2026
8 Dec 2025
15 Dec 2025
8 Dec 2025
15 Dec 2025
8 Dec 2025
10 Dec 2025
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirment of table 300-2. As per Ref. to MoRTH Spec no-301+305.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 Percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (DGBM-Gr-I)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing.
Kilometer stone.
5th Kilometer stone.
Hectometer.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Providing and Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets (350 mm dia).
Providing and Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets (1000mmdia).
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M20
Plain/Reinforced Cement Concrete for wall and slab etc. complete as per Drawing and Technical Specifications. RCC Grade M35
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1% Construction Cost)
M/S HARI RAM SAHU (BID ID -5741620)
M/S ATUL GRAM VIKAS SANSTHAN (BID ID -5732131)
APRAJIT CONSTRUCTION (BID ID -5740785)
M/S SHIV CONSTRUCTION COMPANY (BID ID -5745822)
M/s Hari Construction (BID ID -5741653)
M/S ARCHANA CONSTRUCTION (BID ID -5742533)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
SBD.pdf
Tender Documents • 1.80 MB
BOQ_2020649.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid