| 1 | L1₹4.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.0 L+₹13,338.54 (2.77%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.1 L+₹1.3 L (27.3%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹6.6 L+₹1.7 L (35.8%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Manzoor Hussain L2 | IRSHAD AHMED L3 | BIKRAM PARIHAR L1 | SAFEENA BEGUM L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 0.45 | Cum | 5,000 ₹2,250 | 200 ₹90 Lowest | 200 ₹90 Lowest | 400 ₹180 |
| 2.00 | Providing and laying in position cement concrete of specified grade including curing but excluding
the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand
: 10 graded stone aggregate 40 mm nominal size) | 0.06 | Cum | 17,000 ₹1,020 | 4,000 ₹240 Lowest | 4,000 ₹240 Lowest | 4,800 ₹288 |
| 3.00 | Providing and laying in position cement concrete of specified grade including curing but excluding
the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand :
4 graded stone aggregate 20 mm nominal size) | 0.21 | Cum | 20,000 ₹4,200 | 3,500 ₹735 Lowest | 3,500 ₹735 Lowest | 7,300 ₹1,533 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns | 1.95 | Sqm | 6,000 ₹11,700 | 100 ₹195 Lowest | 100 ₹195 Lowest | 280 ₹546 |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in
layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering,
lead upto 50 m and lift upto 1.5 m. | 0.02 | Cum | 1,00,000 ₹2,000 | 80 ₹1.6 Lowest | 80 ₹1.6 Lowest | 212 ₹4.24 |
| 6.00 | Extraction , transportation and Labur of Wood for making Wooden Gate of 10 ft height above
ground level. The post of Gate should be minimun 2ft depth in earth, including fixing, primer
painting , Writing complete job as per directed by the site incharge Engage 2 Carpenter for 8 days for making Wooden Gate | 16 | No | 5,000 ₹80,000 | 800 ₹12,800 | 800 ₹12,800 | 550 ₹8,800 Lowest |
| 7.00 | Extraction , transportation and Labur of Wood for making Wooden Gate of 10 ft height above
ground level. The post of Gate should be minimun 2ft depth in earth, including fixing, primer
painting , Writing complete job as per directed by the site incharge Engage 4 Labour for 8 days for making Wooden Gate | 32 | No | 670 ₹21,440 | 600 ₹19,200 | 600 ₹19,200 | 400 ₹12,800 Lowest |
| 8.00 | Carriage of materials from source to site of work Sand av. Distance 50 KM MT and HL 20 KM | 0.12 | Cum | 600 ₹71.01 | 80 ₹9.47 Lowest | 80 ₹9.47 Lowest | 6,000 ₹710.11 |
| 9.00 | Carriage of materials from source to site of work Bajri av. Distance 50 KM MT and HL 20 KM | 0.24 | Cum | 10,000 ₹2,367.03 | 100 ₹23.67 Lowest | 100 ₹23.67 Lowest | 6,000 ₹1,420.22 |
| 10.00 | Carriage of materials from source to site of work Cement av. Distance 50 KM MT and HL 20 KM | 0.33 | Tonne | 8,000 ₹2,618.91 | 10,000 ₹3,273.63 | 10,000 ₹3,273.63 | 5,000 ₹1,636.82 Lowest |
Tender Value
₹8.2 L
EMD Value
₹24,570
Closing Date
15 Oct 2025, 4:30 pmClosed
Wildlife Warden Chenab Division,Kishtwar.
Kishtwar
Construction of Butterfly Park including wooden fencing, entry gate 3 Nos of water ponds (Kiyar Yashkhodan) Under Mitigation Plan , Wildlife Division Kishtwar for the Year 2025-26.
2025_FD_291261_1
NIT 23 OF 2025-26 Butterfly Park Yashkhodan Kiyar
Open Tender
Civil Works
Item Wise
90 days
Kiyar, Dachhan
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildlife Warden Chenab Division,Kishtwar.
₹24,570
1 Nov 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
15 Oct 2025
8 Oct 2025
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Extraction , transportation and Labur of Wood for making Wooden Gate of 10 ft height above ground level. The post of Gate should be minimun 2ft depth in earth, including fixing, primer painting , Writing complete job as per directed by the site incharge Engage 2 Carpenter for 8 days for making Wooden Gate
Extraction , transportation and Labur of Wood for making Wooden Gate of 10 ft height above ground level. The post of Gate should be minimun 2ft depth in earth, including fixing, primer painting , Writing complete job as per directed by the site incharge Engage 4 Labour for 8 days for making Wooden Gate
Carriage of materials from source to site of work Sand av. Distance 50 KM MT and HL 20 KM
Carriage of materials from source to site of work Bajri av. Distance 50 KM MT and HL 20 KM
Carriage of materials from source to site of work Cement av. Distance 50 KM MT and HL 20 KM
WOODEN FENCING Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work
Extraction and Supply of Wodden fence Post of minimum Ht-6' minimum Length 4'' & width 4'' including wxtraction , sawing , mechanical carriage , head load , loading & unloadingetc. from approved sources upto site of work complete
Fixing of wooden fence post of prescribed size ,tarring of bottom portion of post and tipping of top portion of post.Qty vide item no.8
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, , last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 5 horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire .
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. . (STAIR)
Sign board incl carriage PAINTING &WRITING COMPLETE JOB. Os Size: 5.00 x 3.00 Ft with vertical iron angle 2 Nos of size 40x40x6 mm iron angle of height 7 ft with 1 mm thick M.S sheet.
Supply & Fixing of required size of U-nails including mechanical carriage , head load , loading & Unloading etc. from approved source upto site of work complete
Carriage of materials from source to site of work Sand av. Distance 50 KM MT and HL 20 KM
Carriage of materials from source to site of work Bajri av. Distance 50 KM MT and HL 20 KM
Carriage of materials from source to site of work Cement av. Distance 50 KM MT and HL 20 KM
Carriage of materials from source to site of workSteel av. Distance 50 KM MT and HL 20 KM
3 NO's POND Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Dry stone pitching, 225mm thick, including cost of stones and preparation of surface.Nallah stone
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
Carriage of materials from source to site of work including loading,unloading and stacking at site comlete job Stone av. Distance and HL 1000 mtr Qty vide item no:-2
Manzoor Hussain (BID ID -2589739)
IRSHAD AHMED (BID ID -2594772)
SAFEENA BEGUM (BID ID -2593749)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .