Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹2.2 Cr+₹37.9 L (21.1%)Rejected-AOC VILLAGE TATKI P O BODLA DISTRICT KURUKSHETRA PIN CODE 136131 HR | KURUKSHETRA | HARYANA | 136131 | ₹2.2 Cr+₹37.9 L (21.1%) | L2 | Rejected-AOC Rate on higher side |
| 3 | Not Admitted-Fee/PreQual/Technical MAIN HUDA MARKET PLOT NO 62 HOUSE NO 62 GROUND FLOOR MAIN HUDA MARKET SECTOR 10A 122001 | GURUGRAM | HARYANA | 122001 | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Qualified because clause -3 already imposed and tender on risk & cost was called under PHED No. 2 Palwal |
| 4 | Not Admitted-Fee/PreQual/Technical 1804 SECTOR 2 HUDA 124001 | ROHTAK | HARYANA | 124001 | - | - | Not Admitted-Fee/PreQual/Technical Others-Not qualified due to conditions not fulfill as per DNIT |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
2 Dec 2024, 3:00 pmClosed
SANDEEP KUMAR
Punhana PHED
Operation and maintenance of 2 No. Ranney wells 26 No. of Tube wells , Pumping machinery and Other equipments alongwith mtc. of pipe line and Mtc. of civil structures, at MBS Maholi , Maintenance of PSC/MS pipe line and special alongwith maintenance
2024_HRY_412385_1
20240A972372 ADA0 4170 9603 9810AD4F9B1B562PUH
Open Tender
Civil Works
Works
730 days
MADHIYAKI
2 documents required · 2 mandatory
₹15,000
₹3.3 L
Yes
4 Jun 2025
20 Nov 2024
2 Dec 2024
20 Nov 2024
2 Dec 2024
20 Nov 2024
Amount
Operation and Maintenance of Rajiv Gandhi Drinking Water Supply Augmentation Project for Mewat (Haryana) Ranney Well Segment Leg-I. “Operation and Maintenance of 2 No. Ranney wells, 26 Nos. Tubewell, Pumping Machinery and other equipments alongwith Mtc. of pipe line and mtc. of civil structures at MBS Maholi, MBS Maryaki and IBS Maryaki, Maintenance of PSC/MS/DI/AC pipe lines and specials alongwith maintenance of its civil structure for Rising main 800mm i/d from MBS Maholi to MBS Maryaki and MBS Maryaki to MBS Punhana and sub rising main of IBS Maryaki to all SBS and other works contingent thereto`. (For two years)
Renney well 2 NO. 1st Year...
Renney well 2 NO. 2nd Year ( @ 3 % Increase)
For MBS Maholi 1st Year....
For MBS Maholi 2nd Year ( 3 % Increase )
For 26 No. Tube wells . 1st Year
For 26 No. Tube wells . 2nd Year ( @ 3 % Increase)....
O and M of PSC rising main line from MBS Maholi to MBS Maryaki and Renney well to MBS Maholi complete in all respect for 1st year..
O and M of PSC rising main line from MBS Maholi to MBS Maryaki and Renney well to MBS Maholi complete in all respect for 2nd year...
For MBS Maryaki 1st year...
For MBS Maryaki 2nd year (@ 3 % increase )
For IBS Maryaki 1st year...
For IBS Maryaki 2nd year (@ 3 % increase )
Operation and Maintenance of PSC/ AC/DI rising main pipe line from MBS Maryaki to MBS Punhana and Sub Rising main from IBS Maryaki to all SBS for 1 st year...
Operation and Maintenance of PSC/ AC/DI rising main pipe line from MBS Maryaki to MBS Punhana and Sub Rising main from IBS Maryaki to all SBS for 2nd year (@ 3 % Increase ).
Manish Kumar (BID ID -1176497)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .