| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹61.9 LAccepted-AOC | ₹61.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹62.4 LRejected-AOC | ₹62.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Sree Muthu Constructions L1 | Modern Infrastructure L2 |
|---|---|---|---|---|---|
| 1.00Molasi road km 3/2 to Vatta parappu road km 0/0 - 1/000 (R 309) | |||||
| 2.00Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. | |||||
| 3.00 | Km 0/000-1/380 | 1,987.2 | Sqm | 6 ₹11,923.20 | 15 ₹29,808 |
| 4.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | |||||
| 5.00 | Km 0/00-1/00 | 405 | Cum | 131.5 ₹53,257.50 | 135 ₹54,675 |
| 6.00 | Km 1/00-1/380 | 153.9 | Cum | 131.5 ₹20,237.85 | 135 ₹20,776.50 |
| 7.00Picking 5 cm to 10 cm old metalled surface and sectioning | |||||
| 8.00 | Km 0/000-1/380 | 1,650 | Sqm | 23 ₹37,950 | 25 ₹41,250 |
| 9.00Collection and supply of gravel from average lead of 1km including cost and conveyance to site and stacking to departmental gauge for premeasurement . | |||||
| 10.00 | Km 0/00-1/00 | 200 | Cum | 341 ₹68,200 | 345 ₹69,000 |
Tender Value
Refer Docs
EMD Value
₹62,800
Closing Date
20 Feb 2026, 3:00 pmClosed
The Project Director
The Project Director
Improvements to the Road fromMolasi road km 3/2 to Vatta parappu road km 0/0 - 1/000 (R 309)R -309 at Tiruchengode Block in Namakkal District under Nabard RIDF 2026-27 With five year Maintenance Pkg.No31/NKL/Nabard/2026-27
2026_RDTN_657193_31
DIPR/981/Tender/2026
Open Tender
Civil Works - Roads
180 days
Tiruchengode
Required Documents as Per Schedule
4 documents required · 4 mandatory
₹0
₹62,800
DRDA Namakkal
3 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
15 Feb 2026
17 Feb 2026
Molasi road km 3/2 to Vatta parappu road km 0/0 - 1/000 (R 309)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking 5 cm to 10 cm old metalled surface and sectioning
Collection and supply of gravel from average lead of 1km including cost and conveyance to site and stacking to departmental gauge for premeasurement .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of HARD BED at
Drilling holes in hard granite 40mm diameter including all charges
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Collection and supply of Gritty gravel from average lead of 1km including cost and conveyance to site and stacking to departmental gauge for premeasurement .
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and erecting steel centering including necessary support for plane surface including all PCC works etc complete
Cement concrete 1 : 3 : 6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Road Making with Hot Applied Thermoplastic Compound with reflectorising Glass Beads on Bitumen Surface
Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet
60cm Equilaterial triangle sign board
60cm Circular Sign Board
Supply and Fixing of H.M Stones etc.,
Supply and Fixing of K.M Stones etc.,
Provision for Scheme Name Board charges etc
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
31.pdf
Tender Documents • 1.65 MB
BOQ_788823.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid