Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC BALAJI WARD BALLARPUR 442701 | BALLARPUR | CHANDRAPUR | MAHARASHTRA | 442701 | L1 | Accepted-AOC Accepted as L1 | |
| 2 | L2₹1.9 L+₹8,894.13 (4.88%)Rejected-AOC RANI LAXMIBAI WARD BALLARPUR 442701 DIST CHANDRAPUR | BALLARPUR | CHANDRAPUR | MAHARASHTRA | 442701 | L2 | Rejected-AOC Rejected |
Tender Value
₹2.6 L
EMD Value
₹3,200
Closing Date
8 Oct 2022, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Venkateshwar Burugpalli S.O.E. (C)
Office of Sub Area Manager Sasti Sub Area
Providing and fixing mine lease boundary pillars at Dhoptala OCM under sasti sub area.
2022_WCL_257321_1
ba3605-civ-e13-2022-23
Open Tender
Civil Works - Others
Item Rate
30 days
Office of Sub Area Manager Sasti Sub Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,200
22 Feb 2025
24 Sept 2022
10 Oct 2022
24 Sept 2022
8 Oct 2022
24 Sept 2022
24 Sept 2022 - 1 Oct 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavated ) manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work upto plinth level : 1:3:6 (1cement:3coarse sand : 6graded stone aggregate 40mm nominal size ).
Steel reinforcement for RCC work including straightening, cutting, bending placing in position and binding all complete. Themo- Mechanically Treated bars
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, piers, Abutments, Posts and Struts.
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1cement:1.5coarse sand: 3graded stone aggregate 20mm nominal size).
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m.
White washing with lime to give an even shade. New work ( three or more coats )
Total impact of GST for the purpose of CTC
SHYAM JOSHI
techsummary_266072.pdf
PDF • 0.84 MB
finsummary_266072.pdf
PDF • 0.84 MB
Award_lease.pdf
PDF • 1.68 MB
finance_266072.pdf
PDF • 0.21 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .