Provision of complete stripping, cleaning and fitment of various Mechanical and Electrical Equipments & cleaning of Sub-Assemblies of Conventional (WAP4) and three phase (WAG9) Electric Locomotive at Diesel Shed, Tughlakabad for 02 year.
TKD-Stripping-OT-2025~NR
TKD-Stripping-OT-2025
Open
Works - General
24 Months
Delhi, Delhi
₹0
₹98,600
26 Dec 2025
3 Dec 2025
12 Dec 2025
86 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 17,11,920 | ||
| — | 42.00 | — | — | ||
| Cab1 and Centre roof removal after all related connections and earthing shunts removal. | — | — | — | 1,03,320 | |
| — | 42.00 | — | — | ||
| Pantographs removal from its base insulators, operating rod disconnection and deposit to section for O/H | — | — | — | 51,870 | |
| — | 42.00 | — | — | ||
| Servo motor pneumatic pipe connection removal and servo motor removal, Throttle Valve removal and deposit to section for O/H. | — | — | — | 51,660 | |
| — | 42.00 | — | — | ||
| Pantographs fitment at its base insulators, operating rod connection and spring weight adjustment for correct sense of operation. | — | — | — | 51,660 | |
| — | 42.00 | — | — | ||
| Servo motor fitment and pneumatic pipe connection and throttle valve fitment to complete. | — | — | — | 52,500 | |
| — | 42.00 | — | — | ||
| Compressors (CP-1, CP-2, CP-3 and Baby Compressor) removal from their bases, pneumatic delivery pipe disconnection, electrical disconnection. | — | — | — | 1,06,680 | |
| — | 42.00 | — | — | ||
| All side body filter (Mio Filters) removal, their cleaning at pressurized water plant. | — | — | — | 1,05,840 | |
| — | 42.00 | — | — | ||
| All side body filter (Mio Filters) fitment. | — | — | — | 1,05,420 | |
| — | 42.00 | — | — | ||
| — | 42.00 | — | — | ||
| — | — | — | 51,660 | ||
| — | 42.00 | — | — | ||
| Cab1 and Centre roof fitment after roof beading change and all related connections and earthing shunts fitment, sealing and water leakage check. | — | — | — | 1,04,160 | |
| — | 42.00 | — | — | ||
| Sand box cleaning, overhauling and sand top-up. | — | — | — | 1,05,840 | |
| — | 42.00 | — | — | ||
| Removal of the roof of Cab-2 | — | — | — | 51,660 | |
| — | 42.00 | — | — | ||
| Unload the Battery Set and send it to the Battery Section | — | — | — | 1,05,000 | |
| — | 42.00 | — | — | ||
| Disconnecting the cable of traction motor | — | — | — | 1,09,200 | |
| — | 42.00 | — | — | ||
| Unloading the RPS | — | — | — | 58,590 | |
| — | 42.00 | — | — | ||
| Unloading the VCB | — | — | — | 58,590 | |
| — | 42.00 | — | — | ||
| Reinstalling the Roof of Cab-2 | — | — | — | 51,870 | |
| — | 42.00 | — | — | ||
| Loading the Battery Set | — | — | — | 1,05,000 | |
| — | 42.00 | — | — | ||
| Loading the RPS | — | — | — | 1,17,600 | |
| — | 42.00 | — | — | ||
| Loading the VCB | — | — | — | 58,800 | |
| — | 42.00 | — | — | ||
| Fitting the Air Flow Relay | — | — | — | 52,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
StrippingTD.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .